📄 Extracted Text (320 words)
To: JEE[[email protected]]
From: curtis R
Sent: Fri 4/17/2009 9:13:08 PM
Subject: Re: Master suite draft budget
Title: Re: Master suite draft budget Ok —
But after Jules knocks it down — you have to pay to get ride of it — plus Jules might remove more than
just the roof. In an hour..
On 4/17/09 5:06 PM, "JEE" <[email protected]> wrote:
lets talk tomorrow
On Fri, Apr 17, 2009 at 5:06 PM, Jeffrey Epstein <[email protected]> wrote:
yes... i can't see demo at 30k jules can knock it down in an hour
On Fri, Apr 17, 2009 at 5:04 PM, curtis R rote:
In the General Conditions -$63,500 - Boscoe, Bruce , Casey and Carlos and Arran
and any other labor —. This gets billed back to the
construction budget
As well as Demolition $30,000
If we build with our own manpower, which we could, we would save. But it would
take from other island projects ,of course.
This budget is based on subcontractors for
Rock work
Concrete
Electrical
Milwork
Plumbing.
On this one - We might be able to use Gary for the electric, Brian/Arran combo for
the plumbing — etc . we could do our own concrete — but ..
Is that what you mean?
On 4/17/09 4:37 PM, "JEE" <[email protected]
<http://[email protected]» wrote:
give me incremental cost.. plese„ boscoe salary
and others is a fixed cost whether or not i build
EFTA_R1_01474532
EFTA02412786
On Fri, Apr 17, 2009 at 3:50 PM, curtis
wrote:
Jeffrey,
Please find attached Draft Budget for the Master Suite.
Notes:
1. Demolition will include what is almost a ful gut job.
the entire roof
all the columns
the existing floor in the bedroom section.
2. The finishes need to be honed down and represent a large
unknown.
3. The cost is around $600 per square foot for a total of 1,372,690
Call to review with Silvina or me for scope adjustment as needed.
(tntr,
EFTA_R1_01474533
EFTA02412787
ℹ️ Document Details
SHA-256
4e4fcc48dfb73ddc506b28a6f01d2df39cb3c3df4ca5d9391eb9d6c8e0db5b7c
Bates Number
EFTA02412786
Dataset
DataSet-11
Document Type
document
Pages
2
Comments 0