attached is what kyle sent which is incomplete as it does not =nclude materials below, rebar, wood, mesh and trucking
costs
will work with daphne and kyle to =btain
funny =ow brice says kyle is working on when you have been asking him for 3 seeks now..
Richard Kahn
HBRK Associates Inc.
575 =exington Avenue 4th Floor
New York, NY 10022
Begin forwarded message:
From: =/b>Kyle reavis
Subject: =/b>LSJ Road Crew =id
Date: =/b>November 14, 2018 at 10:40:18 =M EST
To: =/b>Richard Kah Daphne Wallace
Rich,
For us to self preform this we will need a 4 man crew. =ince most of them will not have experience here I will be
with them =raining them. Once we have our crew set our layout times will be =ut significantly along with turnover time
for mixing our =ruck.
Daphne =an you call Heavy materials and see what our price is for the cement, =tone and sand? This will
determine our price per yard. Thank =ou!
EFTA_R1_01813948
EFTA02615016
Gym Road = 650' x 10'x 4" = 81 =ubic yards 4000 PSI
=nbsp; Total Weight of Cement / Sand / =ravel
=nbsp; NEED TO PRICE THIS
=nbsp; Cement - 49,491 =bs
=nbsp; Sand - 117, 450 =bs
=nbsp; Stone - 129,600 =bs
=nbsp; Time Frame:
=nbsp; 4 man crew- 5 day work =eek
=nbsp; Total Prep = 2 weeks
=nbsp; Pour days= 1 =eek
=nbsp; Cutting = 1 week
=nbsp; Total = = weeks
Pool Road = =/b>250'x 10' x 4" + 31 Yards 4000 PSI
=nbsp; NEED TO =RICE THIS
=nbsp; Cement - 18,941 lbs
=nbsp; Sand - 44,950 lbs
=nbsp; Stone - 49,600 lbs
=nbsp; Time Frame:
=nbsp; 4 man crew = 5 day work =eek
=nbsp; Prep - 1 week
=nbsp; Pour Time- 1 =ay
=nbsp; Cutting - 3 days
Very Respectfully,
Kyle Reavis
2
EFTA_R1_01813949
EFTA02615017
ℹ️ Document Details
SHA-256
4e8ff12b1d78912d5fadbd6e85c4c128095b6c0ecd999201c7ac0bb11423639d
Bates Number
EFTA02615016
Dataset
DataSet-11
Type
document
Pages
2
💬 Comments 0