From: Richard Kahn •
To: "Jeffrey E." <[email protected]>
Subject: Fwd: [T] [External] Urgent assistance needed PWJT8D-219
Date: Tue, 13 Sep 2016 14:19:28 +0000
FYI
Richard Kahn
HBRK Associates Inc.
Begin forwarded message:
From: Larry Visoski
Subject: Re: [T] [External] Urgent assistance needed PWJT8D-219
Date: September 13, 2016 at 10:17:01 AM EDT
To: Richard Kahn
We have to wait for Pratt and Whitney's evaluation on whether FJTurbines Engine shop was at fault by not
shop Peening the C-11 discs„
I'll check with Frank to see if buyer is still onboard with waiting for this process to take its course.
If FJTurbines is found to be Negligent and we lose this deal. Darren thinks we may have legal recourse, I hope
it doesn't get to that point.
At worse case, if it's determined that FJTurbine is negligent Im sure they will pay for repair fully and buyer will
continue the deal.
Pratt indicated no later than 9/21 for an answer back while their engineering and QC/quality control evaluate
this process
Thx
Larry
Sent from my iPhone
On Sep 13, 2016, at 5:09 AM, Richard Kahn < wrote:
Any updates on engine sale.
Richard Kahn
HBRK Associates Inc.
EFTA00818719
On Sep 10, 2016, at 2:30 AM, Larry Visoski c wrote:
Update from Pratt„
The buyer my initiate and inquiry with the FAA since FJturbines may have released this engine without shop
peen,.
read email trail below,
We await Pratt's response before taking this issue to the FAA
Darren, I may need your assistance if this gets ugly with FJTurbines
Thx
Larry
Sent from my iPhone
Begin forwarded message:
From: Global Operations Center <I
Date: September 10, 2016 at 12:53:46 AM AST
To: Larry <IIMI >
Cc: Global Operations Center
Subject: RE: Ill [External] Urgent assistance needed PWJT8D-219
Hi Larry,
We created a case reference CAS-34153-L7.10T7 and sent this over to our engineering / program person for the
.IT8D for his review, and comment. Current Due date set at 9/21next week.
Thank you
Best Regards,
tenet Radmad4ea
Pratt & Whitney Global Operations Center
Please do not address e-mail directly to Barry Rasmussen but rather send them to the Pratt & Whitney Customer Help
('enter so that all information will be addressed in a timely manner.
NOTICE:
Electronic Mail Confidentiality Provision
This email constitutes an electronic communication within the meaning of the Electronic Communication Privacy Act, 18 U.S.C. Sec. 2510 M. Seq., and any
unauthorized interception of this email is strictly prohibited by law. Furthermore, this e-mail and any attachments may contain privileged or confidential
information of United Technologies Corporation and Pratt & Whitney. The information transmitted is intended only for the person(s) or entity to which it is
addressed and may contain sensitive and/or privileged material. My review, retransmission, dissemination or other use of, or taking of any action in
reliance upon, this information by persons or entities other than the intended recipient(s) is prohibited. If you received this in error, please contact the
sender by return electronic mail and destroy/delete any and all copies of this document.
WARNING -- This document may contain technical data the export of which is or may be restricted by the Export Administration Act and the Export
Administration Regulations (EAR), 15 C.F.R. parts 730-774. Diversion contrary to U.S. law is prohibited. The export, re-export, transfer or re-transfer of this
EFTA00818720
technical data to any other company, entity, person, or destination, or for any use or purpose other than that for which the technical data was originally
provided by S is prohibited without prior written approval from and authorization under applicable export control laws.
ECCN: 9E991
NOTICE:
=Document Property Rights Notice (DPRN)
This document is the property of United Technologies Corporation (UTC). You may not possess, use, copy or disclose this document or any information in it,
for any purpose, including without limitation to design, manufacture, or repair parts, or to obtain FAA or other government approval to do so, without
UTC's express written permission. Neither receipt nor possession of this document alone, from any source, constitutes such permission. Possession, use,
copying or disclosure by anyone without OTC's express written permission is not authorized and may result in criminal and/or civil liability.
From: Larry mailto
Sent: Friday, September 09, 2016 6:08 PM
To: Global Operations Center
Subject: Fwd: [1] [External] Urgent assistance needed PWJT8D-219
Hello Thomas, Chris and Albert,.
Can you give me your opinion of the email trail below,.
Pm unclear, how to proceed with this issue,
Can you please assist one more time
Thank you
Larry Visoski
Director of Operations
Jege, Inc
Sent from my iPad
Begin forwarded message:
From: "RIVERA, Frank"
Date: September 9, 2016 at 5:51:50 PM EDT
To: Larry Visoski c, Fred 2 < >, John Janiak
, Alan Boyer [email protected]>
Subject: Fwd: Fwd: [T] [External] Urgent assistance needed PWJT8D-219
Dear Mr. Larry Visoski;
Kindly review the findings of the inspection of your two engines. Please review and advise accordingly.
Thank you.
Frank Rivera
Forwarded message
From: Jerson Martinez
Date: Fri, Sep 9, 2016 at 5:43 PM
Subject: Re: Fwd: [T] [External] Urgent assistance needed PWJT8D-219
EFTA00818721
To: "RIVERA, Frank" Janiak >, Alan
Boyer <alanbgturbineengine.aero>, Fred 2 , "RIVERA, Frank"
Mr. Rivera,
1. Engine Manual P/N: 773128 Section 72-36-45 Insp-00 Page 8011802 states the following.
C. Shotpeen the Slots
NOTE: Shotpeening is necessary if the protective coating has been stripped (YES - Disk Overhauled in 2009 with 9,782 Total
Cycles & then again in 2014 with same 9,782 Total Cycles) and the disk has accumulated more than 5000 cycles or 7500
hours since new (YES - Disk Overhauled in 2009 with 9,782 Total Cycles & then again in 2014 with same 9,782 Total
Cycles) or shotpeened at the last overhaul of the disk (YES - Disk Overhauled in 2009 It Shotpeened). or if there is galling in
the blade slots.
2. AD 2003.16.05 requires the compliance of SB6435R1 which in turn references the Engine Manual 773128 Section 72-36.45
INSP-01Page 805 (16). See below.
(16) Compressor Disk Blade Slots
(a) At each overhaul, strip old coating and plate.
Shotpeen slots. Replate slots and reapply coating
7.,8k y#: AU Au CC-, CE.).
3.Engine Manual 773128 Section 72-36.45 Repair-03 (Ni-Cad replacement) Page 903 Number (9). See below.
(9) If the disk has accumulated more than 5000 cycles or
7500 hours since new or shotpeened at the last overhaul
of the disk, shotpeen the slots by SPOP 501. See
Standard Practices Manual, PN 585005, Section 70-41-02.
See Figure 902.
This is clearly an interpretation issue. Please provide Technical Data that require shotpeen 7500 Hrs and 5000 cycles since last
overhaul as all data states since new. This disk has accumulated 17,794.5 Hrs. and 9,782 cycles since new, has had the
coating stripped and was shotpeened at the last overhaul. The presence or lack there of galling is the only criteria that doesn't
mandate this shotpeen.
Therefore as you can see in the case of this disk (C11 PN:815711.002 SN: BENCAS2345). coating stripped (yes) and 7500
Hours 1 5000 Cycles (yes) or Shotpeened at last overhaul (yes) or galling in blade slots (No) mandates the shotpeen during the
2014 strip & recoat of same.
Please advise at your earliest opportunity. Thank you.
Best Regards,
Jerson M. Martinez
Odyssey Engines
Forwarded messa e
From: Larry Visoski >
Date: Fri, Sep 9, 2016 at 11:56 AM
Subject: Fwd: [T] [External] Urgent assistance needed PWJT8D-219
To: Frank RIVERA > Frank Rivera
Frank
EFTA00818722
PW agrees with Manny
See below,
I provided all information including disc records to Pratt
Thx
Larry
Sent from my iPhone
Begin forwarded message:
From: Global Operations Center <
Date: September 9, 2016 at 11:40:58 AM EDT
To: Lvjet <
Cc: Global Operations Center <
Subject: RE: [T] [External] Urgent assistance needed PWJT8D-219
Dear Larry,
NOTE: The following technical opinion is furnished to you based on the information that was provided
to Pratt & Whitney. This opinion does not constitute FAA/ DER approval.
The Global Operations Center (GOC) has reviewed the scenario described below and would concur
with the interpretation of the JT8D Engine Manual that if the disk has not accumulated more than 5000
cycles or 7500 hours since new or overhaul (which this one has not) it would not require shot peened
again until it reaches that threshold.
Best Regards,
Thomas Grunwald
Pratt & Whitney Global Operations Center
riease ao not aaaress e-mail affect' to Thomas Grunwald but rather send them to the Pratt & Whitney
Global Operations Center ) so that all information will be addressed in a timely
manner.
NOTICE:
Electronic Mail Confidentiality Provision
This email constitutes an electronic communication within the meaning of the Electronic Communication Privacy Act, 18 U.S.C.
Sec. 2510 et. Seq., and any unauthorized interception of this email is strictly prohibited by law. Furthermore, this e-mail and any
attachments may contain privileged or confidential information of United Technologies Corporation and Pratt & Whitney. The
information transmitted is intended only for the person(s) or entity to which it is addressed and may contain sensitive and/or
privileged material. Any review, retransmission, dissemination or other use of, or taking of any action in reliance upon, this
information by persons or entities other than the intended reciplent(s) is prohibited. If you received this in error, please contact the
sender by return electronic mail and destroy/delete any and all copies of this document.
From: Lvjet mailto
Sent: Friday, September 09, 2016 10:46 AM
To: Global Operations Center; BRITTON, TIMOTHY W PW
Subject: (External] Urgent assistance needed PWJT8D-219
Hello Chris Albert and Timothy Britton,
PW help line,.
couple of months ago, you assisted us with our JT8-219 engines with the assistance of Mark Williams our Rep.
regarding a chip in an HPC blade.
I have another question regarding C-11 HPC Disc overhaul procedures if you could please assist?
EFTA00818723
A question has come up in regards to proper procedure for Disc overhaul, mainly Shop Peen requirement.
In 2009 the C-11 HPC Disc part #773128 was overhauled properly and placed in storage preserve according to
PW procedures including Shop Peen then Nicad application. I understand storage is good for 3 years.
FJTUrbines in Miami, purchased this Disc for our install on PWJT8D-219 engine, This C-11 Disc was never
installed on an engine after its overhaul in 2009,. In 2014 FJTurbines overhauled the Disc again, so it could be
installed on our engine.
According to your procedure, you must shop peen and Nicad each overhaul if 7500 hours or shop Peen was
accomplished prior.
an FJTurbine informs that Shop Peen of this C-11 Disc was NOT required, since it was never installed on an
engine after its 2009 overhaul, and proceeded to NiCad the Disc, and utilized the 2009 Shop peen cert as being
complied with, since no hours or cycles happen since its 2009 overhaul.
is it acceptable With Pratt & Whitney to overhaul this disc in this manner? I would like your approval that this was
ok?
I attached the Disc paper work and Reference the overhaul procedure from PW Sub task 72-36-45-38-019-001
(9).
Chris, can you give me your opinion on this matter please?
thank you,
Larry Visoski
Director of Operations
N908JE Boeing 727-100 Volsan
EFTA00818724
ℹ️ Document Details
SHA-256
4f703fba172d78db09713e819070113562267e57adab9bf83745910e718dfb91
Bates Number
EFTA00818719
Dataset
DataSet-9
Type
document
Pages
6
💬 Comments 0