EFTA02458316.pdf

DataSet-11 3 pages 511 words document
👁 1 💬 0
📄 Extracted Text (511 words)
From: Brice Gordon Sent: Monday, July 11, 2016 5:58 PM To: Jeffrey E. Cc: Rich Kahn; Zorro Ranch Subject: Re: ZDC Microwave Project Update Jef=rey =div class="gmail_default" style="font-size:small">Advised Future=Tech of your concerns regarding down time of phone service during install =f new Microwave link. Th= best they can do is Slide the existing T1link down the tower on Sandia Crest and Ranc=, reestablish service this will ta=e two days and 4 men, cost $6800.00, /down ti=e 2 days instead of 5 days once new link is installed, decommission old T= link, down time 2.4 hrs. On Fri, Jul 8, 2016 at 12:37 PM, Brice Gordon > > wrote: ok will see what we can do=about phones On Fri, Jul 8, 2016 at 12:3= PM, Jeffrey E. <[email protected] <mailto:jeevacation@gmail.=om> wrote: ok for sierra, but c=nnot have phone disruption <=r> On Fri, Jul 8, 2016 at 2:33 PM, Brice Gordon =span dir="ltr">< > > wrote: =effrey Future Tech are s=heduled to be on sight July 31st for the install of Microwave Link from Sa=dia Crest to Main House. Install of Link is expected to take 5 to 7 days There have some changes to the initial d=sign. Due to e=gineering and tower owner concerns, the existing T1 link will be decommiss=oned, Ne= Antennas will be installed in place of existing. T1 Phone service and Data services will=use new link, Please note during this time Phone Services to the Ranch will =e disrupted. <=r> Centurylink=/div> EFTA_R1_01562649 EFTA02458316 There is an is=ue with the Fiber Install on Sandia Crest. The initial install entailed laying 6-8 ft of =onduit from Centurylink Demark to an Existing Conduit owned by tower owner= Sierra Nevada Towers. The Tower owner has indicated the existing conduit has been badly =amaged and there will be a need to lay a new run of conduit from Dmark to =is building. (40' rigid buried and 140' above ground galvanized co=duit.), Sierra Nevada have indicated a Estimated Cost of $4500.00, with work been complet=d by Thursday next week = did initial indicate to Rich, we could perform this work for $3500.00, bu= after reviewing scope of work with Future Tech, I would advise Sierra Nev=da perform this work. Centurylink have indicated this could possibly delay install of Cir=uit =div class="gmail_default" style="font-size:small">Do I have your appro=al to move forward with Sierra Nevada Regards Brice <=div> Brice GordonStanley, NM Ph <1=> <tel =AO please note The information contained in this commu=ication is confidential, may be attorney-client privileged, may cons=itute inside information, and is intended only for the use of the addre=see. It is the property of JEE Unauthorized use, disclosure or copyi=g of this communication or any part thereof is strictly prohibited a=d may be unlawful. If you have received this 2 EFTA_R1_01562650 EFTA02458317 communication in error, pl=ase notify us immediately by return e-mail or by e-mail to [email protected], a=d destroy this communication and all copies thereof, including all a=tachments. copyright -all rights reserved Br=ce Gordon Stanley, NM Ph: a href="tel 'value=" target="_bla=k" =div class="gmail_signature" data-smartmail="gmail_signature"> Brice Gordon Stanley, NM=C2 Ph: (505) 934 2809 3 EFTA_R1_01562651 EFTA02458318
ℹ️ Document Details
SHA-256
5054cb5c93627744e2f06e9e631864a15629c015ea6057efecc7f7b37053102f
Bates Number
EFTA02458316
Dataset
DataSet-11
Type
document
Pages
3

Community Rating

Sign in to rate this document

📋 What Is This?

Loading…
Sign in to add a description

💬 Comments 0

Sign in to join the discussion
Loading comments…
Link copied!