PROJECT NO.
1009 Main House Reno.
LSJ, LLC
CODE AMOUNT
DER CC
CONTRACT CHANGE OR
DATE
ean LLC
To (Contractor) K&S Caribb CO No 03 Date 11-9-11
ations
: LSJ — Main House Renov
Name and Location of Project
GED AS FOLLOWS: Change in
THE CONTRACT IS CHAN Contract Amount
PR and/or CCD # Description of Change
(if applicabl)
$3,800.00
y door
of additional breezewa
08-210 Manufacture One 1 pair ,500.00 ea) $3,000.00
irs of Breezeway doors (51
Installation of Two (2) pa $3,800.00
dow opening
Two (2) bathroom win
$7,888.10
Original Co ntra ct Am oun t $13,614.05
ange Order(s)
Net Change by Previous Ch $21,502.15
trac t Am oun t Prio r to this Change Order
Total Con $10,600.00
ount this Change Order
Net increase in Contract Am $32,102.05
Revised Contract Am oun t on,
d date of Substantial Completi
of the se cha nge s in the con tract is increased. The revise all pro visions of the con tract
tion ment to the contract and
The time provided for comple sha ll bec om e an am end
1. This document
therefore, is 17 November 201
r for additional time or
will apply hereto. te and fina l res olu tion of all claims of the contracto
s a comple subject of this Change Ord
er.
This Change Order constitute to or affected by work that is the
pen sat ion rela ted
additional com Contractors, LLC
til sig ned by the aut hor ize d representative of LSJ
g upon LSJ, LLC un
No Contract will be bindin
— Ow ners Representative.
Construction Managers
RS
CONSTRUCTION MANAGE
Date
Date: Brice Gordon
Thomas Melnick Date
OR
ACCEPTED BY CONTRACT
GE:
JUSTIFICATION FOR CHAN
EFTA01171171
ℹ️ Document Details
SHA-256
5056431efef0af990f2176b5c975c6825047b128b2d1efdc341cabd37aeb6a92
Bates Number
EFTA01171171
Dataset
DataSet-9
Document Type
document
Pages
1
Comments 0