EFTA01840912.pdf

DataSet-10 1 page 135 words document
P18
👁 1 💬 0
📄 Extracted Text (135 words)
To: Lvjet From: Jeffrey epstein Sent: Thur 3/15/2012 11:04:34 PM Subject: Re: Gil / B727 Sat Boeing JFK Sorry for all the typos .Sent from my iPhonc On Mar IS, 2012, at 6:53 PM, Lvjet c wrote: Jeffrey, The Boeing is completed and aux tank operational,. Gil update Need to install Rudder, both elevators and rig flight contols tomorrow, engine runs on saturday, once controls are rigged and installed,. Saturday and Sunday would be overtime, and still don't think it will be ready for flight, there is always something that will not ops check good,. personally think Monday is real, aircraft will need full cleaning exterior, interior and stainless steel bright work needs to be polished, which will take a full day, we could pass on this, but should be accomplished,. thx, larry EFTA_R1_00226148 EFTA01840912
ℹ️ Document Details
SHA-256
50e8c15b4e007a6a38b4278be73e8c06f47a4f40222f502187d328e50e9289b9
Bates Number
EFTA01840912
Dataset
DataSet-10
Type
document
Pages
1

Community Rating

Sign in to rate this document

📋 What Is This?

Loading…
Sign in to add a description

💬 Comments 0

Sign in to join the discussion
Loading comments…
Link copied!