EFTA02547099.pdf

DataSet-11 2 pages 231 words document
P23
👁 1 💬 0
📄 Extracted Text (231 words)
From: Marc Dober Sent: Monday, November 28, 2011 9:47 PM To: Jeffrey Epstein Cc: Brice Gordon Subject: Flagpole pool re-plastering and Main pool tile redo Jeff, The proposed schedule to re-plaster the flagpole pool is as following: Bart will be ordering the material as soon as we give the go ahead. It =ill take 5 days to arrive to the island. It will take 2 days to empty and 2 days to fill the pool and the actual =ork on the pool will take 6 days. After the pool is refilled, we need 5 days to make sure the water is =alanced (PH levels, etc) So we are looking at about 20 days of the pool being down start to =inish. Bart will be doing this at his expense. He is currently due $34k and is expecting that this job will cost around =15k and he would be paid the balance after he is complete and you are =atisfied. For the main pool he has submitted a $42,600 proposal to retile the =ool. This is for labor and installation only. Materials will run =pprox. $15k to $20k. Please let us know how you want to proceed Marc=?xml version=.0" encoding=TF-8"?> <!DOCTYPE plist PUBLIC "-//Apple//DTD PLIST 1.0//EN" "http://www.apple.com/DTDs/PropertyList-1.0.dtd"> <plist version=.0"> <dict> <key>conversation-idgkey> <integer>205900</integer> <key>date-last-viewed</key> <integer>0</integer> <key>date-receivedgkey> <integer>1322516796</integer> <key>flags</key> <integer>8623750145</integer> <key>gmail-label-ids</key> <array> <integer>6</integer> <integer>2</integer> </array> <key>remote-id</key> <string>193402</string> </dict> EFTA_R1_01701303 EFTA02547099 </phst> 2 EFTA_R1_01701304 EFTA02547100
ℹ️ Document Details
SHA-256
52813609d791a289d46a931a4d66ad17eb60097f33441706c89ab85eb27d9327
Bates Number
EFTA02547099
Dataset
DataSet-11
Type
document
Pages
2

Community Rating

Sign in to rate this document

📋 What Is This?

Loading…
Sign in to add a description

💬 Comments 0

Sign in to join the discussion
Loading comments…
Link copied!