EFTA02547099.pdf
👁 1
💬 0
📄 Extracted Text (231 words)
From: Marc Dober
Sent: Monday, November 28, 2011 9:47 PM
To: Jeffrey Epstein
Cc: Brice Gordon
Subject: Flagpole pool re-plastering and Main pool tile redo
Jeff,
The proposed schedule to re-plaster the flagpole pool is as following:
Bart will be ordering the material as soon as we give the go ahead. It =ill take 5 days to arrive to the island.
It will take 2 days to empty and 2 days to fill the pool and the actual =ork on the pool will take 6 days.
After the pool is refilled, we need 5 days to make sure the water is =alanced (PH levels, etc)
So we are looking at about 20 days of the pool being down start to =inish.
Bart will be doing this at his expense.
He is currently due $34k and is expecting that this job will cost around =15k and he would be paid the balance after he is
complete and you are =atisfied.
For the main pool he has submitted a $42,600 proposal to retile the =ool. This is for labor and installation only. Materials
will run =pprox. $15k to $20k.
Please let us know how you want to proceed
Marc=?xml version=.0" encoding=TF-8"?>
<!DOCTYPE plist PUBLIC "-//Apple//DTD PLIST 1.0//EN" "http://www.apple.com/DTDs/PropertyList-1.0.dtd">
<plist version=.0">
<dict>
<key>conversation-idgkey>
<integer>205900</integer>
<key>date-last-viewed</key>
<integer>0</integer>
<key>date-receivedgkey>
<integer>1322516796</integer>
<key>flags</key>
<integer>8623750145</integer>
<key>gmail-label-ids</key>
<array>
<integer>6</integer>
<integer>2</integer>
</array>
<key>remote-id</key>
<string>193402</string>
</dict>
EFTA_R1_01701303
EFTA02547099
</phst>
2
EFTA_R1_01701304
EFTA02547100
ℹ️ Document Details
SHA-256
52813609d791a289d46a931a4d66ad17eb60097f33441706c89ab85eb27d9327
Bates Number
EFTA02547099
Dataset
DataSet-11
Type
document
Pages
2
💬 Comments 0