EFTA00731172
EFTA00731173 DataSet-9
EFTA00731174

EFTA00731173.pdf

DataSet-9 1 page 98 words document
V11 P17 V16
Open PDF directly ↗ View extracted text
👁 1 💬 0
📄 Extracted Text (98 words)
Jeffrey, The following proposal is based on Gensler schematic drawings dated 2/26/09. A revised Budget will be issued after the Design Development Plans are submitted by the Architects and again after the Construction Documents are submitted, The attached schedule shows the critical path of information & construction in red. A new Schedule will be submitted with each new Budget. General Conditions $135,400.00 Sitework $599,900.00 Concrete $3,026,120.00 Masonry $590,000.00 Metals $392,410.00 Wood $770,000.00 Moisture / Thermal $523,930.00 Doors and Windows $615,320.00 Finishes $882,000.00 Specialties $44,500.00 Special Equipment $754,000.00 Furnishings $0.00 Special Construction $350,000.00 Mechanical $1,100,000.00 Electrical $725,000.00 $10,508,580.00 EFTA00731173
ℹ️ Document Details
SHA-256
52ee0f6bfb0adac99e4e0bd030045d1e2f01b4d8133337f4f766c93ad7ff6fd9
Bates Number
EFTA00731173
Dataset
DataSet-9
Document Type
document
Pages
1

Comments 0

Loading comments…
Link copied!