EFTA02612246
EFTA02612247 DataSet-11
EFTA02612250

EFTA02612247.pdf

DataSet-11 3 pages 391 words document
P17 V16 P19 V11 D5
Open PDF directly ↗ View extracted text
👁 1 💬 0
📄 Extracted Text (391 words)
From: 1 <[email protected]> Sent: Monday, December 3, 2018 4:49 PM To: Richard Kahn; Kyle reavis Subject: Re: punch list for work in bathrooms cabana's 1,2,3,&4 chilliax ? drywall. .? =schedule for countertops? window=.in <http://windows.in> shwoers etc. On Mon, Dec 3, 2018 at 11:44 AM Richard Kahn rote: Richard Kahn HBRK Associates Inc. 575 Lexington Avenue 4th =loor New York, NY 10022 Begin forwarded message: From: Jay Knoepfel <[email protected]> Subject: punch list for work in bathrooms cabana's 1,2,3,&4 Date: D=cember 3, 2018 at 11:41:39 AM EST To: Richard Kahn <[email protected] <mailto:[email protected]»,=brice gordon <extend jamb of entrance door and trim ou= glass door area <mailto:[email protected]> r all grout sealed and tile cleaned x finish tile install at door <=iv style="margin-top:0px;margin-bottom:0px">install shower trim decide and insta=l threshold at glass shower door • round shelf and bench edge Cabana #2 EFTA_R1_01808217 EFTA02612247 1. touch up floor =rout in two locations 2. replace one floor tile under window 3. round shelf edge 4. =div style="margin-top:Opx;margin-bottom:Opx">extend door jamb and trim o=t to finish glass door install 5. install glass door 6. raise floor drain 7. trim out window and paint trim 8. tile threshold with selected m=terial =/div> Cabana #3 =ol style="margin-top:Opx;margin-bottom:Opx"> replace wall tile marked with blue tape<=div> round over ti=e edges </=pan> tune up=floor grout where grout line exceeds common dimension paint ceiling and drill holes for=lights • Prep =oor opening and plaster to create finished look install glass door final cleaning of tile an= sealing of grout Cabana #4<=div> 1. replace tile edge at shelf configure door open=ng for glass door 2. remove and replace one floor tile marked with blue tape 3. round over edges <=li> 4. raise floor drain</=iv> 5. install glass =oor 6. clean ti=e and seal grout joints =/div> 2 EFTA_R1_01808218 EFTA02612248 =C24> please note The informat=on contained in this communication is confidential, may be attorney-cli=nt privileged, may constitute inside information, and is intended only =or the use of the addressee. It is the property of JEE Unauthoriz=d use, disclosure or copying of this communication or any part thereof =5 strictly prohibited and may be unlawful. If you have received this return e-mail o= by e-mail to [email protected] <mailto:[email protected]> , and destroy this communication and all copies =hereof, including all attachments. copyright -all rights reserved </=iv> --000000000000d3a9c0057c20efd5-- conversation-id 319918 date-last-viewed 0 date-received 1543855768 flags 8590195713 remote-id 878086 3 EFTA_R1_01808219 EFTA02612249
ℹ️ Document Details
SHA-256
5314480f4ed2d8ba58c894c89994ebd35ebaac56e133aab4c92d67d6260b669c
Bates Number
EFTA02612247
Dataset
DataSet-11
Document Type
document
Pages
3

Comments 0

Loading comments…
Link copied!