EFTA02006616.pdf
👁 1
💬 0
📄 Extracted Text (383 words)
To: 'eevacation mail.com 'eevacation mail.com Jeffrey Epsteinbeeyacation©gmail.corn]
Cc:
Fran: ap ne a ace
Sent Wed 8/1/2012 7:06:08 PM
Subject: Danny's list of projects and current staff - August 1, 2012
Greetings Mr. Epstein,
Danny's list of projects and current staff:
Landscapers: Tying down all palm trees for hurricane season - finishing the basket, Five Palms is
next - complete 8/1, then securing shutters on all buildings
Peter St. Omer
Anthony Jules
Dupson Donnissaint
Ednor Montina
Guseneme Dalce
Onel Pierressaint
Reno! Medc
Housekeepers: Following the schedule of cleaning protocol in place by Karen - Danny does daily
walk throughs to check the a/c settings and lights
Basilia Mercado (Dulce)
Maria Rosario (Katie)
Reyna Amparo (Sandra)
Carpenters
Brian Bates - woodshop tunnel, dismantling the old desal, putting up the subwall in the old
engineering office, addressing the Five Palms fire pit
Gregory Montina - temporary helper - with Brian's projects
Victor Amparo - temporary helper - with Brian's projects
Clement (Allangie) Clifton: doors and door frames for the 5 engineering bays, dock box table top,
lay blocks at the Five Palms transformer protection shelter
Benford (Benny) Lewis: working with Clement
Mechanics
Sharimo Wheatley - today assisting with loading the batch plant for transport off island
Karl Henry - assisting the loading of the batch plant
Sheridan Elizee - keeping the boats cleaned, rust-free, maintaining the small landscaping
equipment
Maintenance
Cuthbert Titre (Smiley) - maintains the pools, RO, small repairs to irrigation lines, record keeping
of all the desal, generator maintenance records, vehicle maintenance
lid=
Guy Vicars - barge mate, assists in facility repairs, large plumbing repairs, will clean the bilges on
Big N, complete a main water line upgrade, assist Danny
EFTA_R1_00508082
EFTA02006616
Painters
Gary Titre - finish Berm stone threshold, paint the woodshop tunnel walls, paint the Engineering
bays walls, floors, shelving
Hilian Bedminister (TJ) - working with Gary
Jules - loading the batch plant today, contining to smooth out the roads, will replace the Berm
boulders when the stone threshold is complete, sifting dirt for topsoil
Felito Joseph (Little Buck) - general trucking, trash runs
Danny - Five Palms fiber repair, install breakers for a/c in mechanical desal, research transient
surge protection, library bookshelf lights need low voltage transformers, genset wiring, rewire and
Engineering shed 5 bays
Respectfully,
Daphne and Danny
EFTA_R1_00506083
EFTA02006617
ℹ️ Document Details
SHA-256
53b7ce94fec9ccf81599cf16d3eede4219ee452c4a317bedd1861b8bbcd8e2a8
Bates Number
EFTA02006616
Dataset
DataSet-10
Type
document
Pages
2
💬 Comments 0