EFTA00586804
EFTA00586805 DataSet-9
EFTA00586806

EFTA00586805.pdf

DataSet-9 1 page 257 words document
P17 V16 P23 V11 P19
Open PDF directly ↗ View extracted text
👁 1 💬 0
📄 Extracted Text (257 words)
VIRGIN ISLAND GUNITE POOLS St. Thomas • U.S. Vi in Islands Phone: December 6, 2011 Agreement Proposal submitted to: Work to be performed at: Name: LSJ, LLC Little St. James Street: 6100 Red Hook Quarter Ste. B3 Flagpole Pool #1013 City: St. Thomas State: U.S.V.I. Zip: 00802 Email: Phone: Scope o wor to consist of the following for the completion of the re-plaster for the flagpole pool : Saw cut and chip tile line, all wall fittings, main drains, and steps Acid wash and pressure wash all existing Diamond Brite - Re-mud in all chipped areas - Apply new Diamond Brite — Midnight Blue - Install new wall fittings and main drains — grey color ** Note: 7 day completion from start to finish With payments to be made as follows: S 15,000.00 off balance owed due upon signing of this agreement S 19,742.19 remaining contract balance due upon filling with water Any alteration or deviation from above specifications involving extra costs will be executed only upon written orders and will become an extra charge over and above the estimate. All agreements contingent upon strikes. accidents. or delays beyond our control. Homeowner to carry fire, tornado, and all other necessary insurance upon above work. Respectfully Submitted: Per: Bart Wolterman Note: This proposal may be withdrawn by us if not accepted within 30 days. ACCEPTANCE OF PROPOSAL The above prices, specifications, and conditions are satisfactory and are hereby accepted. You are authorized to do the work as specified. Payment will be made as outlined above. Date Signature EFTA00586805
ℹ️ Document Details
SHA-256
5412ae7df5ea5c7986b2b429f54a5c8c573ea3c6e75a232e326afa536818e558
Bates Number
EFTA00586805
Dataset
DataSet-9
Document Type
document
Pages
1

Comments 0

Loading comments…
Link copied!