EFTA00709075.pdf

DataSet-9 2 pages 665 words document
👁 1 💬 0
📄 Extracted Text (665 words)
From: ion nicola < To: Jeffrey Epstein <[email protected]> Subject: RE: Date: Thu, 23 Dec 2010 01:06:18 +0000 Importance Normal ok, i will do that after i will meet tomorrow and talk about cabana no 3 thank you, ion Date: Wed, 22 Dec 2010 19:55:26 -0400 Subject: Re: From: [email protected] To: please provide me with a professional schedule„ ex caban 1 scheduked finish date ---, caban 2„ finsih date. library„ we would be further ahead, if we had known earlier that you needed help. On Wed, Dec 22, 2010 at 7:39 PM, ion nicola < > wrote: hi Jeffrey, sorry about i wanted to go in new york and stay till after christmas eve.. i thought nobody is going to be here until beginning of january. i thought you know about this... a few days ago asked me when do we want to leave for christmas because she wanted to book our tickets, and then yesterdays asked me when do i want to come back..so i told him begining of january..i didnt know that you dont know about it. sorry. sincerely talking, i would like to take a brake..i was here for a month. if i would have had one more person working in the master bedroom beside my girlfriend, it would have been done by now the room and the vestibule but i couldnt find someone else available for this period. and i didnt concentrate into master bedroom because they told me that is going to take more time for finishing the master bathroom, and even i would have finished with venetian plaster, you wouldnt be able to use the master bedroom untill the bathroom will be done. thats why i worked in cabana no 1, to be done and then you can use that. anyway, i finished today the bathroom in cabana no 1 and looks very good with the white counter top.. you will see. so now if the painters will paint the doors and the crown molding white, that will be done. cabana no 2 is done too after the painters will paint the ceiling. so no 1 and no 2 are almost done. cabana no 3. is giung to show me the design tomorrow morning. for master bedroom i think to finish the room and the vestibule i need like 5 days, and 3-4 days for the other 2 small rooms. my girlfriend put three coats of venetian plaster in the big room in master bedroom and two coats in vestibule, so the room needs one more coat maybe two here and there , and the vestibule 2-3 coats, then the design, and after that two coats of wax and then burnishing, then there are those two small rooms needs the entire process. sorry my girlfriend cant stay longer, she has schedule a grafic design job ..she has to be in new york next week and shes going to be busy for a while with that. maybe i can bring another friend in january, so he can work in master bedroom while I'm doing the cabana no 3., so then we can finish before january 15th both. so now i ask you because nobody asked you before.can i take a brake until beginning of january? even i go for christmas and come back monday, then will be only three days of work, tuesday, wed, and thursday. Hold me that friday nobody is going to be at the island. EFTA00709075 thank you, ion *********************************************************** The information contained In this communication is confidential, may be attorney-dient privileged, may constitute inside information, and is intended only for the use of the addressee. It is the property of Jeffrey Epstein Unauthorized use, disclosure or copying of this communication or any part thereof is strictly prohibited and may be unlawful. If you have received this communication in error, please notify us immediately by return e-mail or by e-mail to [email protected] and destroy this communication and all copies thereof, including all attachments. copyright -all rights reserved EFTA00709076
ℹ️ Document Details
SHA-256
54956696fb9ba0bde750dc2c88b3628ed2c5184466b1a4080353d8d98d5584f7
Bates Number
EFTA00709075
Dataset
DataSet-9
Type
document
Pages
2

Community Rating

Sign in to rate this document

📋 What Is This?

Loading…
Sign in to add a description

💬 Comments 0

Sign in to join the discussion
Loading comments…
Link copied!