Mechanical Work Shop Zprro Ranch
horns Cost
Concrete 4000 psi 40 yds @ $98.00 $ 3,920.00
Rebar 130 sticks © $4.00 $ 520.00
Expansion joints 20 © $4.00 $ 80.00
Concrete Pump 1 day @ $1000.00 S 1,000.00
Garage Door installed 1 © $3260.00 S 3,260.00
Dry Well for drainage 1 $ 775.00
Misc. pvc, gravel $ 2,200.00
forming, glue etc
Labor In House
Cost $ 11 765.00
Wash Pad
Concrete 4000 psi 18 yds ci) 98.00 $ 1,764.00
Rebar 62 sticks $4.00 $ 248.00
Labor in House
Cost 2,012.00
Wash Pad 2.00
Mechanical Shop 11,775.00
Total Expenditure for Both 13,767.00
EFTA00595249
Page I of I
fistaie Repon
Up to Epstein Interests Intranet
SW Home Documents and lists Create Site Settings Help
Zorro Ranch
PI
M.3
Estate Report
Select a View New Item i FlIter I MEdit in Datasheet I :Blink to Outlook
All Events Information Responsibility Photo/Attch Directive lE Comment
Status Pro) No. Pro) Name
Calendar 41 Permitted/Leased Land - 4/27 - Awaiting date for an on Brice/Karen No
Info/Status
Current Events Business Lease site assessment for fees etc by
NM State
lE Report No
Info/Status 55 New Estancia Fountain 4/15 • Installation contractor on Brice/Karen
Active Projects site, received all relevent details,
weight, access, location etc.
Expect estimate 4/29
Actions Brice/Karen No
Info/Status 99 Refurbishment Landscape 4/27 - Project 90% complete.
▪ Alert me Lights - MH Completion expected 5/1
e Export to 103 Resealing Wood - Stables 4/20 - Due to cold weather, start Brice/Karen No
Info/Status
spreadsheet & Adobe date expected mid May
e Modify settings 4/15 - Contractor on site to Brice/Karen No
Info/Status 105 Exterior Stucco Repairs at
and columns MH review scope of work. Expect
estimate 4/28
4/20 - approved replacement Brice/Karen No
Info/Status 111 Replacement Picket
Fences/Refurbishment RC of all picket fences &
refurbishment of grassed yards at
RC
Attached material budget, all
_ _—iaboratn tkitiTe"-
11 ech Workshops/Wash 4/20 - HE approved relocating Brice/Karen No
Info/Status
Pad Construction Mech Workshops to Pole Barn
area & construction of concrete
wash pad outside Workshops
Attached material budget, all
labor "in house"
4/27/2009
htt p://wehsry 0 I /torro/List sfEstater."020Report/JEql0Report .aspx ?ShowI n ri(I=HTML
EFTA00595250
ℹ️ Document Details
SHA-256
57aff26ba7dacf197a50f852cae4bc309286ffa2fc6f03251f462f67db6b1942
Bates Number
EFTA00595249
Dataset
DataSet-9
Document Type
document
Pages
2
Comments 0