EFTA00595247
EFTA00595249 DataSet-9
EFTA00595251

EFTA00595249.pdf

DataSet-9 2 pages 360 words document
P23 V16 D4 P17 D6
Open PDF directly ↗ View extracted text
👁 1 💬 0
📄 Extracted Text (360 words)
Mechanical Work Shop Zprro Ranch horns Cost Concrete 4000 psi 40 yds @ $98.00 $ 3,920.00 Rebar 130 sticks © $4.00 $ 520.00 Expansion joints 20 © $4.00 $ 80.00 Concrete Pump 1 day @ $1000.00 S 1,000.00 Garage Door installed 1 © $3260.00 S 3,260.00 Dry Well for drainage 1 $ 775.00 Misc. pvc, gravel $ 2,200.00 forming, glue etc Labor In House Cost $ 11 765.00 Wash Pad Concrete 4000 psi 18 yds ci) 98.00 $ 1,764.00 Rebar 62 sticks $4.00 $ 248.00 Labor in House Cost 2,012.00 Wash Pad 2.00 Mechanical Shop 11,775.00 Total Expenditure for Both 13,767.00 EFTA00595249 Page I of I fistaie Repon Up to Epstein Interests Intranet SW Home Documents and lists Create Site Settings Help Zorro Ranch PI M.3 Estate Report Select a View New Item i FlIter I MEdit in Datasheet I :Blink to Outlook All Events Information Responsibility Photo/Attch Directive lE Comment Status Pro) No. Pro) Name Calendar 41 Permitted/Leased Land - 4/27 - Awaiting date for an on Brice/Karen No Info/Status Current Events Business Lease site assessment for fees etc by NM State lE Report No Info/Status 55 New Estancia Fountain 4/15 • Installation contractor on Brice/Karen Active Projects site, received all relevent details, weight, access, location etc. Expect estimate 4/29 Actions Brice/Karen No Info/Status 99 Refurbishment Landscape 4/27 - Project 90% complete. ▪ Alert me Lights - MH Completion expected 5/1 e Export to 103 Resealing Wood - Stables 4/20 - Due to cold weather, start Brice/Karen No Info/Status spreadsheet & Adobe date expected mid May e Modify settings 4/15 - Contractor on site to Brice/Karen No Info/Status 105 Exterior Stucco Repairs at and columns MH review scope of work. Expect estimate 4/28 4/20 - approved replacement Brice/Karen No Info/Status 111 Replacement Picket Fences/Refurbishment RC of all picket fences & refurbishment of grassed yards at RC Attached material budget, all _ _—iaboratn tkitiTe"- 11 ech Workshops/Wash 4/20 - HE approved relocating Brice/Karen No Info/Status Pad Construction Mech Workshops to Pole Barn area & construction of concrete wash pad outside Workshops Attached material budget, all labor "in house" 4/27/2009 htt p://wehsry 0 I /torro/List sfEstater."020Report/JEql0Report .aspx ?ShowI n ri(I=HTML EFTA00595250
ℹ️ Document Details
SHA-256
57aff26ba7dacf197a50f852cae4bc309286ffa2fc6f03251f462f67db6b1942
Bates Number
EFTA00595249
Dataset
DataSet-9
Document Type
document
Pages
2

Comments 0

Loading comments…
Link copied!