EFTA01071685.pdf
👁 1
💬 0
📄 Extracted Text (157 words)
VP-BBJ MAINTENANCE REQUIREMENTS
The Base Maintenance checks are carried out at 6 monthly intervals, usually
August/February.
'A'1 Check 6 month Due Aug 2011
'A'2 Check 12 month Due Aug 2011
'C'1 Check 36 month Due Aug 2011
'C'2 Check 72 month Due Aug 2011
'C'3 Check 144 month Due Aug 2011
Line maintenance items carried as and when required.
Monthly check: performed each calendar month (package).
3 monthly items: service Heads Up Display overhead unit desiccant capsule.
150 hrs items: LJH / R/H Engine FMC CDU Bite check.
300 hrs items: CVR operational test
400 hrs items: IDG oil level & Delta P Indicator
Maintenance requirements for 2011.
Al, A2, C1, C2 & C3 Checks due in August 2011, to be performed.
During this maintenance visit all required AD's, Service Bulletins and Service Letters will be
performed.
In August 2011 during the C3 check (144 month), Main & Nose Landing Gear will be removed for
overhaul.
EFTA01071685
ℹ️ Document Details
SHA-256
584fb31b119c8ccdb0478044a8821269ea0ba8439fc42faf8690a7da929407f4
Bates Number
EFTA01071685
Dataset
DataSet-9
Type
document
Pages
1
💬 Comments 0