📄 Extracted Text (251 words)
Carpentry Work
Suggest 2 months work - set price to complete further work and inventory
and work on woodshop
Dock Box top and seat at Dock
Refurbish seat hinges and lid - Complete
Replace end pieces and refinish tabletop - Complete
Master Bedroom
Sliding doors need adjusting - Complete
Install self closing hinges on water closet door - Complete
Dock Boxes at Pools
Replace hinges and Rams on both - need to review
Pool Cabana
Install self closing hinges on toilet door - Complete
Shutters Main Compound
Adjust 6 hurricane hooks - Complete
Add 15 mini exterior hooks - Complete
Adjust eyehooks bedroom 4 entrance - Complete
Beach Office
Weather Proof, Replace Rotten Stair - in progress
Installation of New AC and Housing
Enclose existing fiber feed and switch Complete
Hurricane Bars
Fabric shelf for Hurricane Bars - Complete
Dock Carpet
Replace existing - awaiting carpet
Install on Jet Ski Dock - awaiting carpet
Engineering Gates
Fabricate latches and securing rods - in progress
Daisy the Cow
Repair broken leg - Complete
Steel Shed
Removal of existing bolt patterns & installation of new
EFTA00583108
Barge
Loading Chocks - will start when Barge on LSJ
Engine Hatches - awaiting electrical work to be completed
Gym
Replace Front and bathroom exterior doors - Complete
Punching Bag replace - awaiting direction JE
ATH Dock
Repair/Reconstruct Dock Shed at Barge Dock
Managers Cottage
Need to replace rotten steps
Kite House
Repair of Deck
Pergola
For high road benches - require design details from JE
EFTA00583109
ℹ️ Document Details
SHA-256
589f54d2af1cfd90231320b415c8aa92f0897d0c58d1b6dc6ac6a6fc884e907b
Bates Number
EFTA00583108
Dataset
DataSet-9
Document Type
document
Pages
2
Comments 0