👁 1
💬 0
📄 Extracted Text (491 words)
Amendment #4 Page 665 of 868
I Air a Coinon,
In December 2014. tne Company started operations at Runatullo I i Hytroelectric Plant ?Mich s located all along the Runatullo River located at 6 Km in the
department of Junin, which has 191 MW of installed capacrty
(e) Main contracts
Erreenng. PICCunfenent and Gourmeton rEPC7 Contract be RAWL:lb ft endRunetufflo lU Hicitostcloc Plants
On June 7. 2012. the Company and GCZ Ingenieros SAC.. sutsaibed an EPC contract under welsh GCZ Ingenieros SAC shall be responsitle
for the execution making and rendering of all the works, activities arc ser'ces associated or necessary b execute and develop We erigneenng,
procurement consouction, assembly, teste-g and definde detwery of the Runatulto II and Runatulb III Hp:Mak:tine Plan
In return, Ire Company Shall pay to GCZ Ingeneros $ AC for Ire execution of the worts, U$$91 674.603 (equvelent to Sr 274015,388) incii.ding
Vale Added Tax (NAT) The first payment, made on July 1, 2012. accounted for 10 percent of an advance payment of US$8,225,143 (equivalent
to $!.24,584,952) inducing VAT The remainng shad be pad based on MontNy valuations of We direct cost plus general experses, dedicting 10
percent for amortaation of the prepayment The rcome of the contract shall be cancelled at the &free delivery and conformity declaration of the
works
In order to guarantee to the Company tie property compliance of all the Megatons. GCZ Ingersems SAC Surrendered a bank guarantee letter Of
faitlulty carclenCe tasted nib lava fa USS6,225.143 (equvalert tO Sr 24.554.952)
Likewise, GCZ hgerseros S AC shall surrender to the Company a mortgage guarantee over shares trot GCZ Erergla S AC holds m
Hidroelectnca Santa Cruz S AC . as correct 'motoring guarantee. The amount of sad guarantee equals 10 percent of the contract s total price
This guarantee shall cover defects and/or mperfectors, quaNy. drawn and functioning of the mil works, cqupment materials and facilities in
general corresponding to the works. in accordance with the established by to contract
On July 20, 2012, it was signed an addendum to the EPC contract by wnch GCZ Ingeneros SAC committed to deliver ire hy&cream contracts
lathe startrg of the commercial operation at the latest, on January 1, 2015 These plants were delivered on the agreed date. This contract
(nabbed on Decanter 2014
fie AsiminefrattOn. Operation &V MaPtenanCeCAOMJ Contract br Runieutilo ;1)009(801C Plant and &Katona le HydrOefeCtnc Plant
On Felonry 1, 2013 the Company and GCZ Servcios SAC subsented to sad contract through which ten latter agrees 10 render to services of
adrninistation, operation and inner maintenance to the Runatullo II Hydroelectric Pert and Runebalo III Hydrodectnc Part The contract base 5-
year term ant] Is renewable et matunty
During 2014, the Company cksbursed S/ 1,078,550 (S/ 431,052 n 2013). which are receded n the 'Cost of generator( and 1.40ninstraPee
expanses' captors of tie stawmerts of cOmprehenSive income
F-345
http://cfdocs.btogo.com:27638/cf/drv7/pub/edgar/2015/07/20/0001193125-15-256461/d78... 7/20/2015
CONFIDENTIAL - PURSUANT TO FED. R. CRIM. P. 6(e) DB-SDNY-0058622
CONFIDENTIAL SDNY_GM_00204806
EFTA01367094
ℹ️ Document Details
SHA-256
58ed7af08d51de17282b291f7e2723d6fbd8b085bffdc5eab860e1343edeb36f
Bates Number
EFTA01367094
Dataset
DataSet-10
Type
document
Pages
1
💬 Comments 0