Jeffrey —
Andrew asked me to pull together a written plan for the asset which we are doing. Much has been discussed with Rich
and the primary driver has been to get an extension from BPPR. Once we have the terms on which we can get an
extension, we will have far more clarity on where to invest the capital we are holding on to — to preserve the integrity of
the asset. I have placed focus on life safety only (railings etc.) until the bank makes a decision — and they haven't yet done
so. I am not there as frequently as you and will place more focus on aesthetics (and have made this clear) — its quality of
life and I apologize for not be more sensitive to that.
I am going to make a trip to get in front of the bank to try to speed things along and I hope to get a written document to
you, Rich etc. as soon as I can. If you would like to discuss with over the phone or in person, I am happy to jump on a call
at your convenience or come down to AYH and walk the property with you etc. Just let me know.
For now — we have actioned asap:
1. pressure washing and painting the garage, costing a fix for the ceiling tiles, and looking at adding some lighting.
2. Replace the American flag that is torn
3. P Dock — is waiting on Hoffman to start Oct 1— as discussed with Rich, the degree of success of refurbishing this
dock will be looked as a model for the other docks. It is not a total fix (as will be outlined) but once completed we
can see how it goes and implement it into the BIG grant proposal (see below) to improve the integrity of the
balance of the docks.
4. B and C Dock —pending BIG Grant funding and engineering report. We will do what we can to repair loose boards,
clean up ,etc. The BIG grant is a federal boating infrastructure grant program which matches our equity put into
infrastructure. We have made some applications for AYH and while it takes time — given the needs of the asset
could be very valuable to us. Will be more detailed in the memo we are preparing.
5. B Dock — will remove and replace the rotten timber on the freeboard of those docks
6. B Building STC photos -
hand railings and pressure washing and painting.
Paint siding and doors
B and C building Decking —missing pavers, discoloration, etc. Perhaps we pursue a plan to apply a
uniform spraydeck type finish throughout?
7. Stairs — scoping out cost to replace
Torn Mukamal
President
EFTA00658156
This message, and any attachments hereto, is confidential and intended exclusively for the use of the individual or entity to
whom it is addressed. This communication may contain information that is confidential, proprietary, privileged, subject to a
confidentiality and/or non-disclosure agreement, or otherwise exempt or protected from disclosure (either by contract or under
applicable law). If you are not the intended recipient, you are hereby notified that printing, retaining, reproducing, copying,
disclosing, disseminating or using this message or any information contained herein (including any reliance thereon) is strictly
prohibited. If you have received this message in error, please contact the sender immediately and destroy the message (including
any attachments) and any copies in their entirety, whether in electronic or hard copy format. Nothing contained in this e-mail
shall be considered a legally binding agreement, amendment or modification of any agreement with Island Capital Group LLC
or any of its affiliates, each of which requires a fully executed agreement to be received by Island Capital Group LLC or such
affiliate.
EFTA00658157
ℹ️ Document Details
SHA-256
590a996f8cb80c9700a61c1fbf31b55ab7a36ed0bc68d9be3ed61d97cb21c928
Bates Number
EFTA00658156
Dataset
DataSet-9
Document Type
document
Pages
2
Comments 0