EFTA02266126.pdf

DataSet-11 1 page 203 words document
P18
👁 1 💬 0
📄 Extracted Text (203 words)
To: La Visosk From: Sent: Sat 11/17/2018 4:58:59 PM Subject: Re: Update Thanks Sent from my iPhone > On Nov 17, 2018, at 11:46 AM, Larry Visoski wrote: > Rich, Pete„and > (Not confirmed yet), > JE is delaying the Zorro Ranch trip till Monday 19th at this time. > Monday 19th PBI-ABQ > Then he will return Tuesday, accept, he will fly into Boca (BCT) airport Tuesday evening since POTUS arrives PBI Tue 5pm > Pete, > ***May have to delay the Battery ex-change on the G550 until The week of the 26th when JE returns to PBI from STT. > FYI: > I'm off the schedule 19th-26th > Here's the new schedule: > Monday 8am PHI-ABQ > Dave and Darren Rothell. > Tuesday ABQ-Boca > Dave and Darren • > Friday 23rd Depart Noon > Boca-STT. > Dave and Darren > (Darren will fly the Helicopter upon arrival on St Thomas - LSJ) > Monday 26th STT-PBI arrive after 5pm, is a guess. > Dave and Darren. • > POTUS departs Monday 26th at between 2pm-5pm, I'm sure JE will schedule his arrival after the President departs on 26th„ > Thx, > Larry V > Sent from my iPhone EFTA_R1_01069943 EFTA02266126
ℹ️ Document Details
SHA-256
5a178a7f4272c25fde685b0a2781e5494a5b66666c4f426945d3e8c04d773bc3
Bates Number
EFTA02266126
Dataset
DataSet-11
Type
document
Pages
1

Community Rating

Sign in to rate this document

📋 What Is This?

Loading…
Sign in to add a description

💬 Comments 0

Sign in to join the discussion
Loading comments…
Link copied!