EFTA00798504
EFTA00798508 DataSet-9
EFTA00798511

EFTA00798508.pdf

DataSet-9 3 pages 312 words document
P17 P23 V16 V11
Open PDF directly ↗ View extracted text
👁 1 💬 0
📄 Extracted Text (312 words)
Bluewater Construction, Inc Estimate 6501 Red Hook Plaza #201 St Thomas, VI, 00802 Date Estimate # 11/30/2018 226 Name / Address I.SG/GSG 13rice Gordan Cabana 4 Roof Replacement Project Description Qty Rate Total Remove and re-install new metal roof at Cabana 4. 18,750.00 18,750.00 Paint new vulkem roof. Paint to be provided by owner. 4,200.00 4,200.00 Total $22,950.00 EFTA00798508 Bluewater Construction, Inc Estimate 6501 Red Hook Plaza #201 St Thomas, VI, 00802 Date Estimate # 11/30/2018 227 Name / Address LSG/GSG Brice Gordan Q-Hut Repair and Finish Project Quonset hut addition Description Qty Rate Total Removal of damaged or bent panels back to original building. 1.200.00 1,200.00 Add aprox 16' to front of hut, removal of back wall of hut, and add 16,400.00 16..400.00 aprox 18' of new hut. Including roll down door and man door as discussed. All material to be provided by owner. Total \I-Nnin, EFTA00798509 Bluewater Construction, Inc Estimate 6501 Red Hook Plaza #201 St Thomas, VI, 00802 Date Estimate # 11/30/2018 225 Name /Address I.SG/GSG 13rice Gordan Staff Cottage Finish Project Bedroom addition Description Qty Rate Total Build bedroom on cistern at cottage per sketch. Including labor and 40,520.00 40,520.00 material. All wood work. Including 6" ship lap wood on exterior. Including 5' walk way deck with railing to connect main house to bedroom. Provide and install new metal roof to be painted by others. 13,200.00 13,200.00 Provide and install 6" ship lap wood on exterior of main house. 10,700.00 10,700.00 Paint existing wrap around porch, new walk way deck and all new 8,700.00 8,700.00 ship lap wood on main house and new bedroom Install owner provided ceramic tile at main house and guest house. 7,360.00 7,360.00 Plumbing work to tie into existing at main house (Fixtures to be 5,900.00 5,900.00 provided by owner) Add sub panel and outlets and switches per code. 6,700.00 6,700.00 Total $93,080.00 EFTA00798510
ℹ️ Document Details
SHA-256
5bc561d3c0c615ee4c9d62ea97edf5c957d630d0d041714abff2fdc7d0a0f1c5
Bates Number
EFTA00798508
Dataset
DataSet-9
Document Type
document
Pages
3

Comments 0

Loading comments…
Link copied!