EFTA00808005.pdf
👁 1
💬 0
📄 Extracted Text (81 words)
March 4, 2018
SSVI EXPERT, LLC
QUOTE FOR GREAT ST. JAMES
TO:
Broke Away Dock Section
Reconstruction of Broke away Dock (Jet Key Area)-
$4,800.00
Reconstruction Shelter 1
Scope of work:
Installation of 8 upright columns (wooden)
Hip Roof (according to existing drawings
Installation of Cyprus under thatching
Thatching on top-
S27.000.00
Replacement of slots on dock
54.200.00
Repair of concrete on each side of Shelter 2
$2,500.00
TOTAL COST: $38,500.00
Sincerely,
Ce/e/eifrg eZerts
Elderfield Roberts
Director
SSVI-EXPERT BUILDERS LLC
EFTA00808005
ℹ️ Document Details
SHA-256
5bf5d238a9bf2ef2a8df6356cdba22b4c4ca0e26df7c8d2411a56992bbb1c087
Bates Number
EFTA00808005
Dataset
DataSet-9
Type
document
Pages
1
💬 Comments 0