EFTA01205942
EFTA01205945 DataSet-9
EFTA01205946

EFTA01205945.pdf

DataSet-9 1 page 152 words document
V16 P17 P19
Open PDF directly ↗ View extracted text
👁 1 💬 0
📄 Extracted Text (152 words)
From: Daphne Wallace To: Jeffrey Epstein <jeevacation®gmail.com> Cc: ann rodriquez >, Rich Kahn Subject: Fwd: Engineering Design Revisions Date: Fri, 24 Apr 2015 19:26:40 +0000 Attachments: C1.0_-CONCEPT_4-24-2015pdf.pdf; LTSJ-CZM-(4-24-2015).pdf Greetings Sir, Revisions from John for your review and comments. Respectfully, Daphne Forwarded message From: John P. Woods, AIA Date: Fri, Apr 24, 2015 at 2:24 PM Subject: Engineering Desi n Revisions To: Da hne Wallace , ann rodriquez < >, Cecile de Jongh Daphne, Attached is the revised Preliminary Design for the R.O. & Generator Roofing Project. It incorporates all of Mr. Epstein's comments from recent emails. We have also included a conceptual site plan for the new Maintenance & Workshop Building. This site plan moves the building closer to the edge of the abutment. It will be used for discussion with CZM on Tuesday, May 5. JPW This email is free from viruses and malware because avast! Antivirus protection is active. EFTA01205945
ℹ️ Document Details
SHA-256
5d2673f3e10384ad19e77476d4d4527480905eda50fc0ef77e9e186f27505762
Bates Number
EFTA01205945
Dataset
DataSet-9
Document Type
document
Pages
1

Comments 0

Loading comments…
Link copied!