EFTA02609973.pdf

DataSet-11 2 pages 554 words document
P23
👁 1 💬 0
📄 Extracted Text (554 words)
From: brice gordon Sent: Tuesday, December 18, 2018 3:33 PM To: [email protected] Subject: Fwd: Barge Do wish for me approach Barry Loudermilk?Regarding this work Sent from my iPhone Begin forwarded message: From: michael g=idden Date: December 18, 2018 at 8:15:06 AM MST To: J <[email protected]> Cc:</=> brice gordon m» , Richard Kahn commouppinium Kyle reav is Subject:<=b> Re: Barge Good Morning. Wi=h regard to the barge, 3 weeks is the expected time needed for the exhaust w=rk, the rub rail installation, and also inspect and address rudder alignmen= along with propeller inspections. There is also a list of general maintena=ce items Boscoe has that can be attended to while out of the water for that=3 weeks. With reg=rd to the scope of electrical work to be done there are two items on LSJ th=t will be done with a combination of in house labor and local contractors. T=ey would be the duc bank from the generator building to the sea water intak= building that will include the new fiber for the desal system and the repa=r of the 5 palms electric and fiber feeds due to your request that the work=be done as soon as possible. The material for th= duc bank is on island and the material list for 5 palms is going out today=for pricing. I was going to have LSJ purchase all the material and have a l=cal contractor install for which I am going to get two prices. The only area where the amount of potential work is likely to inter=st a stateside company would be GSJ. The issue w=th getting bids at this point is any scope of work that may be put into a l=st is simply an idea with no engineering or design to base an actual bid on= Before you can issue a scope of work to be bid on the=e needs to be a considerable amount of time and money spent with an enginee=ing and design firm to produce drawings and/or designs, on paper, that cont=actors can then put a dollar figure to. I reached out t= Springline for this specific purpose and they declined ,as have Jaredian D=sign. A stateside contractor may be interested i= doing design-build and maybe that would be a path to explore but I do not h=ve any connection with a company of that type. EFTA_R1_01804132 EFTA02609973 [email protected]> wrote: how many day= neeeded. . what work still required barge. other b=ats ready more inportantly is where is the scope of ele=rtic jobs needed as we discussed a week aglo On Mon, D=c 17, 2018 at 2:45 PM michael glidden wrote: Good day. Is there any update as to when scheduling can be made for the maintenance an= exhaust work needing to be done on Big N ? &n=sp; please note The information contain=d in this communication is confidential, may be attorney-clie=t privileged, may constitute inside information, and is inten=ed only for the use of the addressee. It is the property of.IEE Unauthorized use, disclosure or copying of th=s communication or any part thereof is strictly prohibited and may be unlawful. If you have received this com=unication in error, please notify us immediately by return e-=ail or by e-mail to [email protected] <mailto:[email protected]> , and destroy this com=unication and all copies thereof, including all attachments. c=pyright -all rights reserved 2 EFTA_R1_01804133 EFTA02609974
ℹ️ Document Details
SHA-256
5db66fa6c39482054b9a9d7631b5da8bf6ca2207a90374772b8fd9386eb989fc
Bates Number
EFTA02609973
Dataset
DataSet-11
Type
document
Pages
2

Community Rating

Sign in to rate this document

📋 What Is This?

Loading…
Sign in to add a description

💬 Comments 0

Sign in to join the discussion
Loading comments…
Link copied!