EFTA02609973.pdf
👁 1
💬 0
📄 Extracted Text (554 words)
From: brice gordon
Sent: Tuesday, December 18, 2018 3:33 PM
To: [email protected]
Subject: Fwd: Barge
Do wish for me approach Barry Loudermilk?Regarding this work
Sent from my iPhone
Begin forwarded message:
From: michael g=idden
Date: December 18, 2018 at 8:15:06 AM MST
To: J <[email protected]>
Cc:</=> brice gordon
m» , Richard Kahn commouppinium
Kyle reav is
Subject:<=b> Re: Barge
Good Morning.
Wi=h regard to the barge, 3 weeks is the expected time needed for the exhaust w=rk, the rub rail installation,
and also inspect and address rudder alignmen= along with propeller inspections. There is also a list of general
maintena=ce items Boscoe has that can be attended to while out of the water for that=3 weeks.
With reg=rd to the scope of electrical work to be done there are two items on LSJ th=t will be done with a
combination of in house labor and local contractors. T=ey would be the duc bank from the generator building to the sea
water intak= building that will include the new fiber for the desal system and the repa=r of the 5 palms electric and fiber
feeds due to your request that the work=be done as soon as possible.
The material for th= duc bank is on island and the material list for 5 palms is going out today=for pricing. I was
going to have LSJ purchase all the material and have a l=cal contractor install for which I am going to get two prices.
The only area where the amount of potential work is likely to inter=st a stateside company would be GSJ.
The issue w=th getting bids at this point is any scope of work that may be put into a l=st is simply an idea with
no engineering or design to base an actual bid on=
Before you can issue a scope of work to be bid on the=e needs to be a considerable amount of time and money
spent with an enginee=ing and design firm to produce drawings and/or designs, on paper, that cont=actors can then put
a dollar figure to.
I reached out t= Springline for this specific purpose and they declined ,as have Jaredian D=sign.
A stateside contractor may be interested i= doing design-build and maybe that would be a path to explore but I
do not h=ve any connection with a company of that type.
EFTA_R1_01804132
EFTA02609973
[email protected]> wrote:
how many day= neeeded. . what work still required barge. other b=ats ready more inportantly is
where is the scope of ele=rtic jobs needed as we discussed a week aglo
On Mon, D=c 17, 2018 at 2:45 PM michael glidden
wrote:
Good day.
Is there any update as to when scheduling can be made for the maintenance an= exhaust work needing
to be done on Big N ?
&n=sp; please note
The information contain=d in this communication is
confidential, may be attorney-clie=t privileged, may
constitute inside information, and is inten=ed only for
the use of the addressee. It is the property of.IEE
Unauthorized use, disclosure or copying of th=s
communication or any part thereof is strictly prohibited
and may be unlawful. If you have received this
com=unication in error, please notify us immediately by
return e-=ail or by e-mail to [email protected] <mailto:[email protected]> , and
destroy this com=unication and all copies thereof,
including all attachments. c=pyright -all rights reserved
2
EFTA_R1_01804133
EFTA02609974
ℹ️ Document Details
SHA-256
5db66fa6c39482054b9a9d7631b5da8bf6ca2207a90374772b8fd9386eb989fc
Bates Number
EFTA02609973
Dataset
DataSet-11
Type
document
Pages
2
💬 Comments 0