Project descriptions
Set forth below is a lent summary of each of the projects that we expect will be included in our initial portfolio ',aunty completion of the Organizational Transactions
Unless othenvise noted. we expect that affiliates cf our Sponsor we provide O&M for such projects In additi.on. several of these projects me sAect to prixect-tevel
(naming arrangements See 'Description of certain indebledness—Project.level financing arrangements' for ad:Ronal informant., raga/deg Pose fnancing
arrangements.
Our Brazilprojects
ESPRA
Our ESPRA project is located in the cties of Itarnataju. Jucuruga. Vinod. and Medeiros Nato of Bahia. Braze This 41 8 MW capacity project corn-fenced commercial
Operations airing tre second quarter of 2008. The project has three edvidual twdroeectric assets. Upon completion Cl the Renova Transactionand receipt of an
outstanding governmental consent, we wil have a ion ownirship intent in Ins project We expect to receive the governmental consent alter the completion of this
offenrg
The PPA courterperty w Centres Electicas &askew S A. or '£letrobas,' the largest electric power company n Latin Arnenca well 42 3 GW of installed capacity and
55.1 thousand kilometers of hansoms:nines. Eletrctras has a lag-term credt rating of Baa3 by Moody's and a long-term local issuer rating of EISEN by S&P. The PPA
is schedttled to terminate during the second granter of 2028 and provides for a base price of BRL 121.00.0511(approximately SO 04 kWh). Ousted annually based on the
IGP-M general price Index.
SaVarla
Our Salvador project is located ri the ones of Guarombi GaeM6 and 'gnat of Bahia Brazil This 195 2 MW capably aged commenced commerce] operators donne
the Madquarter of 2012 Tbs project has rile individel sitesmt. a total of 122 wind generator lutines Upon completon of the Renova Transaction, we we have a
100% camerae, interest in this project
Tre PPAcountemarly a Me Chamber cr Electric Energy Commeraakzatco or 'CCEE' which hat 2.953 agents and 19,918 registered connects with 88 8 GW of energy
traded WM a ccaracied capacity of 84 0 MW, the PPA is scheduled to [emanate dunng the second quarter of 2032 and provides for an average once on base date of
BRL 145.8/MW, (approximately $0.05 kWh) adjusted annually based on the IPCA consumer price index. Ire PPA amides for surplus or ccmpereaton payment over
the contracted arrart, with production over 130% or alder 90% pad the subsequent year. and production within 90% and 130% pad every four years The project
employs GE 1 &de turbines
Saha
Our Baba project is located in the cites of Guanarrb and Igapora of Bahia, Brazil This 99 2 MW capacity project commenced commercial operations during the third
quarter of 2012 This project has fete inclackial ales wth a total of 62 wind generator turbines Upon completion of the Renova Transactor we wdl have a 103%
ownership interest in tta project
Tre PPA courterparly a re CCEE Win a contracted capacity of 43.0 MW, the PPA is scheduled to terminate during second goner of 2032 and provides for an average
price on base date of BRL 145 8rMifin (approximatey $0.06 kVVn) aquas annually based on the IPCA consumer price index The PPA provides for surplus or
compensation payment over the contracted amount, with production over 130% or under 90% paid the subsequent year. and production within 90% and 130% paid every
fox years The project employs GE 1 Brie turbines
199
http://cfdocs.btogo.com:27638/cf/drv7/pub/edgar/2015/07/20/0001193125-15-256461/d78... 7/20/2015
CONFIDENTIAL - PURSUANT TO FED. R. CRIM. P. 6(e) DB-SDNY-0058164
CONFIDENTIAL SDNY_GM_00204348
EFTA01366636
ℹ️ Document Details
SHA-256
5df567b69526f39ac746688fcb8e17a2e1237476c46db7ae7012710306020e5c
Bates Number
EFTA01366636
Dataset
DataSet-10
Document Type
document
Pages
1