EFTA01020901.pdf
📄 Extracted Text (270 words)
From: Richard Kahn
To: Jeffrey Epstein <[email protected]>
Subject: Fwd: LSJ PRD Refit
Date: Wed, 03 Oct 2018 21:14:10 +0000
Attachments: PRD_bottom_Job.pdf; PRD_Antifouling.pdf
Inline-Images: IMG_2492.jpg; IMG_249ljpg; IMG_2493.jpg; IMG_2494.jpg
attached is another invoice for PRD that was not included below for new upholstery and new lace on top int the
amount of 5,850
please advise if ok to proceed
thank you
Richard Kahn
HBRK Associates Inc.
575 Lexington Avenue 4th Floor
New York. NY 10022
to
fa
c
Begin forwarded message:
From: brice gordon
Subject: LSJ PRD Refit
Date: September 13, 2018 at 9:05:16 AM EDT
To: Rich Kahn <
Cc: Carlos Rod < >, LSJ GSJ
Rich
Attached proposals for Repairing & Painting of topside and hull of PRD
Photo's of existing Hull and Rub rail
New Rub mil will be installed, this has already been located and purchased.
Please note when we returned to LSJ, The Security decal was removed and Danny repaired hull and gave the boat a quick paint job, as
BVI painters where still suffering the effects or the Hurricanes. I was unable to locate rub mil at the time.
Please note some delineation is occurring at the stem section between the hull and topside, where the rub mil is missing.
Carlos is also working on new electrical panels, as existing original panels are failing due to corrosion. This Panels control Nav lights,
GPS, Fuel, Bilge pumps, Aux lights etc.
PRD is scheduled to go to BVI painters week of the 17th Sept.
Cost Outline:
Bottom Job $9300-
Anti Fouling Black $1800-
Electrical Panels (2) 1000.00-
regards
Brice Cordon
EFTA01020901
The Saint James Group
USVI
Ph:
EFTA01020902
ℹ️ Document Details
SHA-256
5ec55b84ba5c1745e9a5c855e2336f1191aec2f3cd7758897be3330362dc3798
Bates Number
EFTA01020901
Dataset
DataSet-9
Document Type
document
Pages
2
Comments 0