Construction Proposal
August 5, 2015
Between the Owner: LSJ
Little St. James Island
St. Thomas, VI
And the Contractor: Betteroads Asphalt LLC
For the Project: LSJ Roadway/Pathway Drainage Measures
Little St. James Island
USVI
SCOPE OF WORK:
Excavate for and place 32 concrete swales with rip rap detention areas as shown on drawings
entitled "Little St. James RV and Pedestrian Pathway Re-Surfacing Project" and dated September
18, 2014. Each proposed area contains the following;
• Concrete Swale measuring 6ft. (W) x l2ft. (L) x 4in. (D)
• Aggregate Base Pad measuring 6ft. (W) x I2ft. (L) x 3in. (D)
• Rip Rap Detention Area measuring 8ft. (W) x 8ft. (W) x 6in. (D)
TOTAL BASE PRICE: $42,062.40
LSJ Roadway/Pathway Drainage Measures August 5. 2015 I of 2
EFTA00608343
Project Totals:
Name Quantity Unit Cost Unit Total Cost
Road Drainage Measures
Concrete swale 32 $855.00 Ea. $27,360.00
Aggregate Base Pad 32 $138.00 Ea. $4,416.00
Rip Rap Detention Area 32 $150.00 Ea. $4,800.00
Company Overhead Percentage 15.00% 50.00 Percent of Costs $5,486.40
G rand Total $42,062.40
LSJ Roadway/Pathway Drainage Measures August 5, 2015 2 of 2
EFTA00608344
ℹ️ Document Details
SHA-256
5fe2be435f01be89841d7df7672bd337487ba693793b91bfceaab08d5b8aa05b
Bates Number
EFTA00608343
Dataset
DataSet-9
Document Type
document
Pages
2
Comments 0