EFTA01366443
EFTA01366444 DataSet-10
EFTA01366445

EFTA01366444.pdf

DataSet-10 1 page 486 words document
P21
Open PDF directly ↗ View extracted text
👁 1 💬 0
📄 Extracted Text (486 words)
Amendment #4 Page 15 of 868 166..k..0.51.158.69.1 Our initial portfolio, the Call Right Projects and ROFO Projects The following tab* provides an overview of the projects trat we expect von compose car meal ponfolo We expect to scone certain d the projects included in our Mal portfolio grow)) the consummation of the Pending Ai:quietens arc the transfer of Ire Ccorsibuted Construction Projects Our intel ;erode includes- 0) approximately 428.6 MW of projects tat we expect to acquire substantially concurrently with the completion of this &fears troappraomately 340.9 MW of projects Vat we expect to acquire shortly after the competion of this often% upon receipt of pending governmental approvals and lender consents and (a) approximately 286.8 MW d projects that we expect to acquire clunng the remainder of 2015 when such projects are expected to reach CCO This Wenn; is not ccn0boned on the ccncurrent closing d all d the Pending Acquisitions. As of the date of this prospectus we have not yet recewed all of the governmental, regulatory or third-party approves or consents require] to conplele as of these acquisitors, and Ire smog for those approvals is outside of our comet Atones!)It, we cannot tissue you that all of the Pendrg Acquitters will be oonsurrenated on the t3 met ode curenty contemplated or at all For mote !rforrra ton about tne projects included in our initial portfolio see 'Business—Our portfolio • Pending Total Acquisition Remaining Net Capacity %, of Total Not Capacity a of Duration of PPA Country (MY40) MW (MM/y4 Sites (Years), " Brazil Projects: Wind 2944 20.9% 294.4 14 17 HYdroor 41.8 30 418 3 13 Total Brazil 338.2 23.9% 338.2 17 17 India Projects: Winclm 119.4 85 101 6 4 18 Solar 134.0 9.5 0.0 12 23 Total India 253.3 18.0% 101 6 16 21 Honduras Projects: Winds, 126.0 9.0 126.0 1 22 SOW., 82.0 58 82.0 3 20 Total Honduras 208.0 14.8% 208.0 4 21 CNne Projecrs: Wm 148.5 10.8 0.0 3 15 Saar 18.0 1.3 0.0 1 18 Total China 166.5 11.8% 0.0 4 18 Uruguay Solar PIOj0C fr d 7' 101.1 7.2% 26.4 3 213 South Africa Projects: VYinem4, 17.6 12 17.6 1 19 Sciatic," 81.3 58 41.4 5 19 Total South Africa 98.8 7.0% 510 6 19 Costa Rica WindProjocts4s, 74.0 53% 74.0 2 14 Penthisiro Projectex,, 72.5 52% 72.5 6 18 Nicaragua Wind Project 44.0 31% 44.0 1 18 Thailand Solar Proper. 39.3 26% 00 9 26 Malaysia Soler Projects 12.3 09% 0.0 4 3) Total') 1106.1 a e21.7 72 19 III reel moot,reeteeerestre manna andel oseenat. mai* a sundae tee eaidtion al a Itelliyoulteles by me eseareage d eceriemie ~erste ertnatteeles es Mho riete et Manama Genentne apacey rearary blind al s watt> of **a Swaged She-hoe in OW prospeckt Fa KOS iMingicallhalto tern nal plecelavelie CCO. the tansISA caudalbid alipialy. 7 http://cfdocs.btogo.com:27638/cf/drv7/pub/edgar/2015/07/20/0001193125-15-256461/d78... 7/20/2015 CONFIDENTIAL - PURSUANT TO FED. R. CRIM. P. 6(e) DB-SDNY-0057972 CONFIDENTIAL SDNY_GM_00204156 EFTA01366444
ℹ️ Document Details
SHA-256
6011d49130cdbc65fbd3f7c484245a0e52834f20b818344e887f6e72aa14f8fc
Bates Number
EFTA01366444
Dataset
DataSet-10
Document Type
document
Pages
1

Comments 0

Loading comments…
Link copied!