📄 Extracted Text (135 words)
From:
Sent: Monday, June 27, 2011 9:24 PM
To: Anthony Barrett; Andrew Lasso
Subject: 14G Flooring
Attachments: IMG_5533.jpeg
Hey guys.. I'm going to be installing new wood floors into my apt. The =aterials should arrive next week on either the 7th
or 8th, and then =hey will start the installation on the 11th. It should take about 2-3 =ays. Does this schedule sound OK
with you? Where should I have the =ontractors send their insurance information?
They will be ripping out the carpet, and the marble tiles and parquet =loor which is currently under the carpet.
Apparently half the apt is =hite marble tiles and the other half is parquet. They will be doing =verything except the
bedroom, kitchen and bath.
The sample of the wood I've chosen is below..
Thank you,
1
EFTA_R1_01239923
EFTA02324219
ℹ️ Document Details
SHA-256
6084ccf310690b4b590004fb8b0e8008c6886d4f2532233c1d8d94191f066107
Bates Number
EFTA02324219
Dataset
DataSet-11
Document Type
document
Pages
1
Comments 0