EFTA02374179.pdf

DataSet-11 1 page 147 words document
👁 1 💬 0
📄 Extracted Text (147 words)
From: Lvjet Sent: Tuesday, April 1, 2014 7:15 PM To: [email protected] Subject: update Jeffrey, Boeing co=pletion is based on Engines returning from Miami,. Engine shop should be ready to deliver the engines first week of May, =y guess May 15th or about that date for Boeing test flight,. sorry, missed your call, I was on the phone with Miami Engine shop,.</=iv> first engine is in test cell for pre disassemble runs,. bore scope ind=cates some delamination of Compressor area side walls, light corrosion„ w=ich we expected in tail pipe area, to early to tell price impact, but thes= are normal for engine corrosion inspection,. -Gulfstream PIM is schedule for baggage door seal when we arrive =hursday, part is in hand already and will start as soon as we Land. I will=have them inspect Fwd door seal for inflation issues, etc during this=visit,. thx Larry 1 EFTA_R1_01380876 EFTA02374179
ℹ️ Document Details
SHA-256
609623532e44a2f9679d2e15e26c5a04f327b918f81c3d1e162991923c1fff05
Bates Number
EFTA02374179
Dataset
DataSet-11
Type
document
Pages
1

Community Rating

Sign in to rate this document

📋 What Is This?

Loading…
Sign in to add a description

💬 Comments 0

Sign in to join the discussion
Loading comments…
Link copied!