📄 Extracted Text (1,217 words)
From: jeffrey E. <[email protected]>
Sent: Monday, May 22, 2017 5:56 PM
To: Richard Kahn
Subject: Re: seat prices
sign contract and begin
On Mon, May 22, 2017 at 1:55 PM, Richard K=hn
wrote:
please advise
than= you
Richard Kahn
HBRK Asso=iates Inc.
575 Lexington Avenue 4th Floor
New York, NY 10022
Begin forwarded message:
From: Eric Roth <[email protected]>
Subject: RE: seat prices
Date: May 22, 2017 at 1:54:29 PM EDT
Vdiv>
To: Richa=d Kahn .
Richard,
As noted, I rec=gnize the original number from the original breakdown of 4/25/17 and I bel=eve we may
have made a mistake then. This number was changed in all following revisions.
EFTA_R1_01888801
EFTA02649279
There have be=n so many changes in this proposal including changes to this particular co=t code item
420.
=p class="MsoNormal">
Best Regards,
=ric
ERIC H. ROTH I PRESIDENT
www.intljet.com <http://www.intljet.com/>
chttp://twitter.com/t4Vintljet> <http://www.facebook.com/intljet>
2221 Smithtow= Avenue, Long Island MacArthur Airport, Ronkonkoma, New York 11779<=>
From: Richard Kahn [
Sent: Monday, May 22, 2017 1:46 PM
To: Eric Roth
Subject: Re: seat prices
attached below are the figures you sent me on 4=25-2017 which i believe shows 116,800/ 8 seats =
14,600</=>
please advise
2
EFTA_R1_01888802
EFTA02649280
thank you
Richard Kahn
HBRK Associates Inc.
575 Lexington Avenue 4th Floor
New York, NY 10022
From: "Jeffrey E." <[email protected] <mailto:[email protected]»alu>
Subject: Re: G550 sn 5173
Date: April 25, 2017 at 12:30:19 PM EDT=/u>
To: Eric Roth Ivjet
>, Richard Kahn <
please copy larry and rich on all emails=u>
On Tue, Apr 25, 2017 at 12:13 PM, Eric Roth40=A0
wrote:
Oat=: 4.24.17
Cli=nt: JE
Air=raft: G550
Ser=al Number: 5173
soft goods
3
EFTA_R1_01888803
EFTA02649281
200 Cockpit Area</=> Pr=ce
202 Window Line<=u>
$ 3,294.00
203 Upper Side Wall Panels</=>
$ 3,256.00
204 Lower Side Wall Panels</=>
$ 5,713.00
205 Glareshield</=> $ 2,133.50
206 Bulkhead Panels</=>
$ 3,058.00
207 Center pedestal</=>
$ 1,074.00
208 Crew Seats
$ 11,230.00c=>
209 Control column boots=u>
$ 1,459.50
210 Jepp storage
$ =C2110 824.00
211 Crew privacy curtain
$ 2,022.00
225 Floor Covering (Cockpit)
$ 4,419.00
230 Cockpit Paint / Touch up
$ 1,473.00
300 =C24o Entrance Area
Pr=ce
4
EFTA_R1_01888804
EFTA02649282
301 Headliner Panels
$ 2,620.00
304 Airstair Treatment
$ 4,580.00
311 Fwd Lavatory Upper Sidewall Panel=u>
$ 1,098.00
314 R/H Fwd Lay Potty Seat</=>
$ 2,533.00
320 Jumpseat
$ 8,425.00
325 Floor Covering (Entryway)<=>
$ 1,272.00
400 Main C=bin Area
Pr=ce
401 Headliner Panels
$ 9,825.00
402 R/H & L/H PSU / Valance Panels
$ 13,535.00c=>
406 Window Line Panels<=p> $ 13,915.00<=>
409 Lower Side Panels=/u>
$ 14,730.00
412 Fwd Cabin Bulkheads=/p> $ 3,973.00
416 Aft Cabin Bulkheads=/p> $ 3,973.00
420 Cabin Single Seats (8)</=>
$ 116,800.00
422 Divan(s) -2-<=p> $ 49,190.00<=>
5
EFTA_R1_01888805
EFTA02649283
423 Divan End Arm Cabinets</=>
$ 4392.00
425 Floor Covering
$ 38,235.00<=>
500 Galley Area
Pr=ce
501 Headliner Panels
$ 1,897.00
525 Floor Covering (Galley)
$ =C2I> 636.00
600 Aft Lavatory Area<=u>
Pr=ce
601 Headliner Panels
$ 1,897.00
606 Potty Seat & Shroud<=u>
$ 3,794.00
611 Aft Lavatory R/H Closet=/u>
$ 4,580.00
612 Aft Lavatory L/H Closet=/u>
$ 4,580.00
625 Floor Covering (Aft Lavatory)<=u>
$ =C24, 848.00
700 Aft Baggage Area</=pan>
Pr=ce
701 Recover Panels
$ 11,605.00<=>
6
EFTA_R1_01888806
EFTA02649284
703 Baggage Door Vinyl Flap<=u>
$ =C24> 737.00
725 Floor Covering
$ 3,772.00
730 Paint/Touch Up
$ 3,505.00
800 Miscellaneous
Pr=ce
801 Remove Interior / Inc. Inspection<=span>
$ 14,500.00<=>
802 Install Interior / Detail in Aircr=ft
$ 33,050.00c=>
803 Fire Blocking (jump, 3 materials in main=
$ 50,820.06<=>
804 Vertical / Composite Burn Cert.
$ 7,566.00
807 Maintenance Runner(s)
$ 2,134.00
829 Engineering / Certificate<=>
$ 1,700.00
836 Exterior Paint • ballast for paint
$ 5,020.00
$ 485,460.00
woodwork & finish
7
EFTA_R1_01888807
EFTA02649285
800 Miscellaneous
Pr=ce
801 Remove Interior/ Inc. Inspection<=span>
$ 11,850.00<=>
802 Install Interior / Detail in Aircr=ft
$ 43,653.00<=>
806 Woodwork (all plus finish)<=>
$ 373,267.00
808 Install Placards
$ 4=AO 6,860.00
Hangar Rent
$ 25,000.00=/span>
$ 460,630.00
modifications
Mods
Pr=ce
317 Forward Crew Galley=/p> $ 5,267.00
402 R/H & 1/H PSU / Valance Panels - clo=eout
$ 8,425.00
406 Window Line Panels<=p> $ 7,789.00
407 R/H & 1/H Drinkrail / Ledges<=>
$ 3,572.00
410 Side Wall Tables (rare earth mag, suppor=s)
$ 19,865.00c=>
8
EFTA_R1_01888808
EFTA02649286
417 Aft Cabin Curtain (acoustic, track, magn4s)
$ 9,050.00
424 Credenza
$ 14,975.00<=>
427 Aft 1/H Closet (new cabin)=u>
$ 22,340.00a>
502 Aft R/H Galley
$ 15,410.00<=>
503 Aft L/H Galley
$ 21,090.00c=>
602 L/H PSU / Valance Panel (mirror, hinged)=/span>
$ 6,115.00
605 Aft Lavatory Vanity=/p> $ 13,860.00'c=>
606 Potty Seat & Shroud (split, ca=ity)
$ 5,490.00
611 Aft Lavatory R/H Closet (toilet paper)</=pan>
$ 2,071.00
814 110 VAC Outlets (fwd crew galley)=u>
$ 3,761.00
815 Lighting System
$ 6,740.00
829 Engineering / Certification / structural=C240 & elect.
$ 85,490.00c=>
$ 251,310.00
9
EFTA_R1_01888809
EFTA02649287
options
Options 1
Bid Price
809 Metal Platinga>
$ 56,470.00a>
Options 2
Bid Price
405 Inner Window Shades=/p> $ 38,640.00<=>
Options 3
Bid Price
813 USB Ports</=>
$ 10,840.00a>
Options 4
Bid Price
420 Cabin Single Seats=/u>
$ 27,610.00<=>
On May 22, 2017, at 1:06 PM, Eric Roth wrote:
Richard,
=p class="MsoNormal">
10
EFTA_R1_01888810
EFTA02649288
I believe there may have been a mistake in th= original break out number we provided.
As you can see below, after initially discounting the=cost per seat from Rev 2 to Rev 3, I have
held the cost per seat consisten=- inclusive of all changes.
This aside, Jeffrey makes continuous changes, so we are always shoo=ing at a moving target.
No. of Seats Price Q=A0 Q=A0 Per Seat $ =C24, Proposal Revision
-6- 4>=AO =C24e $104,560 =C21> $17,427 =C2. Rev 2
-8- =C24) 40=A0 $122,106 Q=AO $15,263 Q=A0 Rev 3
-6- 4,=A0 =C24e $91,580 =C24> $15,263 4P=A0 Rev 4
-6- 4>=A0 =C24> $91,580 =C2* $15,263 4>=A0 Rev 5
-8- 40=A0 =C24e $122,106 =C24> $15,263 Q=AO Rev 6
Best Regards,
Eric
11
EFTA_R1_01888811
EFTA02649289
ERIC H. ROTH I PRESIDENT
<image007.jpg>
I www.intljet.com <http://www.intljet.com/> <image008.jpg>
<http://twitter.com/Wintljet> =/span><image009.jpg> <http://www.facebook.com/intljet>
=p class="MsoNormal">
2221Smithtow= Avenue, Long Island MacArthur Airport, Ronkonkoma, New York 11779<=>
From: Richard Kahn
Sent: Monday, May 22, 2017 11:47 AM
To: Eric Roth
Subject: seat prices
In reviewing last few versions of bid i noticed=that the seat prices keep changing in Main Cabin
Area (420)<=p>
Original quote had 8 seats in the main cabin ar=a for $116,800 which is $14,600 per seat
Latest quote dated 5.19.2017 now has 8 seats fo= $122,106 which is $15,263.25 per seat
I am not sure what caused this price increase a= i know JEE originally talked about suede and or
cashmere
Now I understand current path is leather (2006 =entley color) which i understand to less
expensive than previous two choic=s
Please advise
Thank you
Richard Kahn
12
EFTA_R1_01888812
EFTA02649290
HBRK Associates Inc.
575 Lexington Avenue 4th Floor
New York, NY 10022
plea=e note
The information contained in this communication is
confi=ential, may be attorney-client privileged, may
constitute inside inform=tion, and is intended only for
the use of the addressee. It is the prop=rty of
JEE
Unauthorized use, disclosure or copying of this
commun=cation or any part thereof is strictly prohibited
and may be unlawful. =f you have received this
communication in error, please notify us immed=ately by
return e-mail or by e-mail to [email protected] <mailto:jeevacation@gm=il.com> , and
destroy this c=mmunication and all copies thereof,
including all attachments. copyrigh= -all rights reserved
13
EFTA_R1_01888813
EFTA02649291
ℹ️ Document Details
SHA-256
6102afeeb867a539c4eb5f947162c469d21600a06146e94f89631831834de2c2
Bates Number
EFTA02649279
Dataset
DataSet-11
Document Type
document
Pages
13
Comments 0