EFTA01884424.pdf

DataSet-10 4 pages 549 words document
👁 1 💬 0
📄 Extracted Text (549 words)
To: Craig Marti From: Jeffrey Epstein Sent Thur 5/10/2012 10:44:58 PM Subject: Re: Pricing on Engineering Building Pad Im sorry„ did i get an answer to what bill brian and john have been doing. On Thu, May 10, 2012 at 5:45 PM, Craig Martin wrote: We had discussed trying to get the building permitted. In the future if you want to erect the building we would need a stamped pad plan by govt. We can skip that if you want. Tom had said there are drafting services in STT that could draw a simple plan. The labor figure is using Tom's construction crew, plus a few more workers that they need on the days they pour cement. I will get Tom to give a breakdown. Craig From: Jeffrey Epstein <.eevacation marl com> To: Craig Martin Cc: Richard Kahn Sent: Thursday, May 10, 2012 4:06 PM Subject: Re: Pricing on Engineering Building Pad what does site drawings mean . who is doing. this makes no sense, who is doing earthwork and for how long. i want now to see details , rich follow up On Thu, May 10, 2012 at 3:55 PM, Craig Martin wrote: Here is the quote on the engineering building pad. This is for the pad only. Please see exceptions below. This pad is designed to hold a future building. Bolts for building, minor drainage is included. If only a pad is needed without provisions for a building the price could be reduced slightly. Craig New Engineering Building Pad Outside Material Labor Shipping Trucking Tax Vendor Temp 200 200 EFTA_R1_00299183 EFTA01884424 Enclosure/safety Material Handling 600 Equipment Rental 1500 Misc Expenses 1000 1000 Layout/Survey 200 800 Earthwork and Demo 2500 2000 Site Drawings 1000 Pest Control 2800 Site Dranage 1000 1000 Pipes/Utilities 500 2000 Concrete 9350 8000 2500 Vapor Barrier 200 200 Ties/Accessories/bolts1500 1000 Rebar 2400 1200 Saw Cutting 250 400 Curing/Protection 300 400 Fine Grade 1000 Wood/Formwork 1200 1400 Fastners 400 Sub Totals 18500 4300 22700 4500 Total 50000 Note; This is a basic pad No Utilities, septic sysyem, electrical, wall, or engineering yard work The pad will have 3 gray water drains. The pad will not have sanitary drains Includes min work on electrical vault EFTA_R1_00299164 EFTA01884425 The information contained in this communication is confidential, may be attorney-client privileged, may constitute inside information, and is intended only for the use of the addressee. It is the property of Jeffrey Epstein Unauthorized use, disclosure or copying of this communication or any part thereof is strictly prohibited and may be unlawful. If you have received this communication in error, please notify us immediately by return e-mail or by c-mail to [email protected], and destroy this communication and all copies thereof, including all attachments. copyright -all rights reserved *********************************************************** The information contained in this communication is confidential, may be attorney-client privileged, may EFTA_R1_00299165 EFTA01884426 constitute inside information, and is intended only for the use of the addressee. It is the property of Jeffrey Epstein Unauthorized use, disclosure or copying of this communication or any part thereof is strictly prohibited and may be unlawful. If you have received this communication in error, please notify us immediately by return e-mail or by e-mail to [email protected], and destroy this communication and all copies thereof, including all attachments. copyright -all rights reserved EFTA_R1_00299166 EFTA01884427
ℹ️ Document Details
SHA-256
616f0b8ff02b2672888f49b1ff1e31f0d9774a2fa38aab887faefa77d1d085ac
Bates Number
EFTA01884424
Dataset
DataSet-10
Type
document
Pages
4

Community Rating

Sign in to rate this document

📋 What Is This?

Loading…
Sign in to add a description

💬 Comments 0

Sign in to join the discussion
Loading comments…
Link copied!