EFTA02708287
EFTA02708288 DataSet-11
EFTA02708291

EFTA02708288.pdf

DataSet-11 3 pages 492 words document
P17 P23 V16 D4 V11
Open PDF directly ↗ View extracted text
👁 1 💬 0
📄 Extracted Text (492 words)
ARISMA AIR CONDITIONING CORP. July 18, 2013 Richard Kahn HBRK Associates Inc. 575 Lexington Avenue, 4th Floor, New York, New York 10022 Townhouse 9 East 71Street New York, NY Re: supplemental/additional air conditioning Dear Rich: Arista Air Conditioning Corporation is pleased to submit our proposal for special air conditioning of the master bedroom and the gym as well as having additional capacity for future air handlers as follows: Arista Air Conditioning Corp. hereby proposes to furnish and install the following: Engineering: We will hire a professional licensed mechanical engineer to survey and prepare sealed mechanical drawings for this project, including expediting with the NYC Building Department. Equipment: One (1) Mitsubishi CitiMulti 10 ton R-series (simultaneously heating/cooling) condensing unit. Unit to be rigged to roof and set upon equipment supports. One (1) 2.5 or 3 ton Mitsubishi air handling unit to be installed in the electrical closet adjacent to the master bedroom. One (1) 2.5 or 3 ton Mitsubishi air handling unit to be installed in closet of gymnasium. All required ductwork to install a supply diffuser in the cove in the crown molding of the bedroom. on the wall adjacent to electrical closet. ( owner to provide services of general contractor to make openings required and to re-plaster and paint same.) Sheetmetal ductwork in gym area to connect unit to existing supply diffuser over closet door. Install new thermostats for each air handler with remote temperature sensors if required. Prepare wiring diagram for your electrician to power up new condensing unit and air handlers. THE NY TM-STATE INDUSTRY LEADER IN AIR CONDITIONING, HEATING & REPRIOIRATION 38-26 TENTH STREET, LONG ISLAND CITY, NY 11101 • TEL: 718.937.1600 • FAX: 718-937-8689 • YAYW.ARISTAIR COM EFTA_R1_02109142 EFTA02708288 All refrigerant piping from rooftop condensing unit to branch controller, then from branch controller to the two air handlers for the bedroom and gym. We will leave spare parts for future air handlers. System to be evacuated and charged with refrigerant. Units will be started up and operation explained to staff. We will perform controlled inspection for New York City Building Department. Total Quoted Price $ 97,925.00 • Work excluded: cutting, patching, painting and decorating. Roofing. Overtime. Power wiring. Structural steel if required. Our price is based is based upon a Capital Improvement and therefore includes all sales tax for material and equipment purchased for this project. There is a one year warranty on all labor and materials provided by Arista Air Conditioning Corporation and a five year warranty on the compressor provided by the manufacturer. If you have any questions, please feel free to contact us. Re ctfully submitted, Aria Conditioning Corporation I tanley FI. Berger Chief Executive Officer • if we can have your rigger who is putting your water tower on the roof, put the condensing unit up at the same time. There would be a credit to you of $6,200.00 Accepted: Date: Terms: 1/3 upon signing Balance based on requisitions. EFTA_R1_02109143 EFTA02708289 EFTA_R1_02109144 EFTA02708290
ℹ️ Document Details
SHA-256
61ad1578d74780c661f6dc3ebe37690ef4f165db0a38211214d52a217fe7b038
Bates Number
EFTA02708288
Dataset
DataSet-11
Document Type
document
Pages
3

Comments 0

Loading comments…
Link copied!