Main Compound Remodel #1009
Budget Adjustment
31 March 2010
Code Description Budget Adjustment Revised Actual
06-201 Interior Trim $0.00 $9.500.00 $9,500.00 $0.00
08.210 Wood Doors $0.00 LI
$52.000.00X$52.000.00
..,../
$0.00
09-200 Plaster $0.00 $10.000.00 S10.000.00 $0.00
09.600 Floor Tile Patch / Repair $5.000.00 $19,500.00 24500.00 $0.00
09-920 Painting $0.00 $5.000.00 $5,000.00 $0.00
16-000 Electrical $0.00 $38.000.00 $38.000.00 $0.00
$5.000.00 $134,000.00 $139,000.00 $0.00
ncrease in budget $134.000.00
Approved:
EFTA00622330
Page I of I
Gary Kerney
From: Gary Kerney
To: Sent: Fri 3/12/2010 10:39 AM
Jeffrey Epstein
Cc:
Subject: cottages interior
Attachments:
Rough budget Interiorpo furniture. Should
be able to complete work in the same
sept 30 timeframe as roof work ie
Cottage 1
electrical rewire
$20,000
replace floor tile 7.500 (1) inexpensive tile could be 2 or 3 times depen
ding
walls plaster/paint on selection
6,500
replace rotted doors and shutters
20.000
woodwork
3.500
total $57,500
Cottage 2
replace tile
$ 6,000 (1)
replace rotted doors and shutters
18.000
woodwork 3,000 /
total $27.000 se
Cottage 3
electrical rewire $18,000
replace tile 6,000 (1)
walls plaster and paint 4.000
replace rotted doors and shutters 18,000
woodwork 3.000
total $ 49. 500
•
grand total S134,000
Illtps:fisecurc.landmarklandco.com/exchangeKiKerne
y/Sent%2011cmskottages%20interior... 3O611010
EFTA00622331
ℹ️ Document Details
SHA-256
61f35dcfd25dc8ab92c473a6892d61ac38942990361893a169577b65bc25edab
Bates Number
EFTA00622330
Dataset
DataSet-9
Type
document
Pages
2
💬 Comments 0