B.V.I. Painters Ltd
Estimate
P.O. Box 824,
Road Town, Tortola
British Virgin Islands.
Tel: 284 494 4365
Name/Address
Little C
Carlos Rodriquez
St. Thomas
Date Estimate No. Project
02/25/17 2895
Item Description Quantity Cost Total
Labour and Labour and Material for Topside, Deck and cabin 5,400.00 5,400.00
Material house
Topside Paint job include
1.Grind out bad Spots
2.Fill where needed with west System Epoxy 407
tiller
3.Sand and Fair area
4.Sand intire topside
5.Tape amd Mask
6.Spray two coats of Primer
7.Sand Primer
8.Change Tape
9.Spray four coats of paint
10.Sand Paint
11.Spray two coats of clear
Labour and Labour and Material for deck and Cabin house 9.900.00 9.900.00
Material
Deck and Cabin house Job include same as Topside
excluding clear coat
0.00 0.00
upper deck Stiplin will remain the same
lower deck paint with Non Skid
Cabin house top will be spray with Non Skid
Overhead will stay textured
Labour and Labour and Material for the Bottom 1.200.00 1,200.00
Material
Sand and Paint
Total
Page 1
EFTA00612473
B.V.I. Painters Ltd
Estimate
P.O. Box 824,
Road Town, Tortola
British Virgin Islands.
Tel: 284 494 4365
Name/Address
Little C
Carlos Rodriquez
St. Thomas
Date Estimate No. Project
02/25/17 2895
Item Description Quantity Cost Tot al
Sherwin Williams Paint will be used for the bottom
Note : We will remove the Rob Rail and Inspect if
there is anything unusual in our findings we will call
to inform and there will be be an extra charge.
total $16.500.00
Page 2
EFTA00612474
ℹ️ Document Details
SHA-256
628e0a54d1b651ee179e64fee6af58e68b40026de41a0c1267208b1848a05a43
Bates Number
EFTA00612473
Dataset
DataSet-9
Document Type
document
Pages
2
Comments 0