From: Richard Kahn <
Sent: Tuesday, September 4, 2018 4:48 PM
To: Jeffrey E.
Subject: Prosolar update
Richard Kahn
HBRK Associates Inc.
575 =exington Avenue 4th Floor
New York, NY 10022
Begin forwarded message:
From: =/b>Dan Prosolar <
Subject: =/b>Re: Friday June =9th
Date: =/b>September 4, 2018 at 12:11:51 =M EDT
To: =/b>brice gordon <
Cc: Marcelo < >,
Brian Walden < >, Brad Spernak <
=lt <mailto >>
good morning all! hope =veryone had a great weekend.. minus GSJ with no power.
i feel very good about my visit today. i was =eceiving error codes pertaining to an OVER-VOLTAGE situation. this
is =reat news considering we have been fighting the opposite problem since =he hurricanes. i have had the system set to
perform at the absolute =eek voltage it can to avoid loosing power. this maximum voltage setting =eeters the system on
the edge of its capabilities. as we see now it has =btained and exceeded its voltage setting limits on the sunny islands.
=here is no damage done, only the inconvenience of it shutting down to =rotect itself. Today i throttled back the target
voltage by lv. this =hould prevent more shutdowns due to over voltage. i think we have got =his system dialed in.
All the best, Dan Chrisman
EFTA_R1_01833712
EFTA02623900
On Mon, Sep 3, 2018 at 6:57 PM, brice gordon < <mailto >>
=rote:
Good Evening
The solar system is down on GSJ
No power =unny islands
Sunny boys seem to be in =farm
Cluster box no power
Please advise as to Dans schedule
Regards =rice
Sent from my =Phone
On Jul 11, =018, at 2:10 PM, Marcelo < > wrote:
Good =fternoon Richard,
Please =ee the below email containing Dan's summary of what actions he =erformed on his
last visit to GSJ.
Regards, =/span>
Marcelo =erez
Project Manager
<401A3348183040D088A29AA3089AB8441431569).jpg>
www.prosolaramerica.com
From: Dan Prosolar <mailto
Sent: =/b>Wednesday, July 11, 2018 1:10 PM
To: =/b>Marcelo <mailto
Subject: Re: FW: =riday June 29th
2
EFTA_R1_01833713
EFTA02623901
Good =fternoon all, sorry for the delay my email had an issue and became
=nlinked so I wasn't receiving these untill now. Regarding 65J =ere is what's been achieved.
-all Aquion battery =odules are wired to bypass the corroded, water damaged
circuit boards =hat could interfere with charging profiles.
-sunny islands (6) =ere downgraded to firmware version 6.0.02. This was done
to allow a =roader, linear charge profile to be set
-charging parameters =re now based on voltage set points rather than state of
charge =alculations done internally with different references.
-max charge voltage =as been set to 58.5V and the batteries will not stop
charging untill a =oltage 1.5V over the set limit is a achieved for 15 seconds. This gives =hem the ability to serpase the
previous charge voltage of 56.7V
- the main issue =hat caused so much down time before was as follows. A target
charge =oltage that matched the Aquion batteries was not possible with the =revious profile. Compiled on that was
faulty Aquion circuit boards =reventing the batteries from properly charging to a suitable voltage. =quion, as we know, is
no more, so it's impossible to obtain =eplacement parts. Aquions bms never met the as advertised performance =nd
created more issues than we could have imagined. In short, the =hanged I made allowed for a higher, more suitable
battery voltage to be =chieved and prevents the premature shut down we saw before.
Again, sorry for the =elay, hope all is well
Thanks
Dan Chrisman
Senior Technical =pecialist
Prosolar=LLC
3
EFTA_R1_01833714
EFTA02623902
From: Richard Kahn <manta
Sent: =/b>Wednesday, July 11, 2018 10:30 AM
To: =/b>Brian Prosolar <mailto
Cc: Brad=S rnak; michael glidden <mailto > ; Brice Gordon
<mailto >;
Subject: Re: Friday June 29th
can we do thursday morning or anytime friday
when can expect =an's summary?
please =dvise
thank =ou
Richard Kahn
HBRK =ssociates Inc.
575 Lexington Avenue 4th Floor
New York, NY 10022
On Jul =0, 2018, at 2:18 PM, Brian Prosolar <
wrote:
Afternoon =ichard,
Brad is traveling to =an Francisco for a conference and I'm boarding a plane to
STX. ='ve asked Dan to write a synopsis of his efforts and we have =een monitoring for proper function. I'll relay this
tomorrow =nce he's finished.
We're still =valuating but all is functioning as intended for the moment.
Additional =onitoring and confirmation are needed since the weather over the last =eek has been extremely cloudy.
Would it be possible =o have our call on Thurs. afternoon at 3 EST?
4
EFTA_R1_01833715
EFTA02623903
Regards,
Brian Walden
ProSolar America, Ilc
Director of =perations
On Jul 10, 2018, at 1:50 PM, Richard Kahn =It
<mailto: > wrote:
i have =ot yet heard back from anyone on a time to speak
please advise
thank you
Richard Kahn
HBRK Associates Inc.
575 Lexington Avenue 4th Floor
New York, NY 10022
On Jul =, 2018, at 5:36 PM, Richard Kahn < > wrote:
can we please =rrange a call for tomorrow to review current status of GSJ solar
thank you
Richard Kahn
HBRK Associates Inc.
575 Lexington Avenue 4th Floor
New York, NY 10022
5
EFTA_R1_01833716
EFTA02623904
On Jun =9, 2018, at 1:36 PM, Brian Prosolar <
wrote:
Afternoon =ich,
I =elieve the normal boat arrival time is 8 or 8:30 a.m. in Redhook. =nbsp;
Dan =ill be there.
Regards,
Brian Walden
ProSolar America, =lc
Director of =perations
On Jun 29, 2018, at 1:20 PM, Richard Kahn =lt
<mailto: > wrote:
please =onfirm what time you will be arriving at GSJ on Monday
thank you
Richard Kahn
HBRK Associates Inc.
575 Lexington Avenue 4th Floor
New York, NY 10022
tel 212-971-1306
fax =12-320-0381
6
EFTA_R1_01833717
EFTA02623905
On Jun =8, 2018, at 1:42 PM, Brian Prosolar <
wrote:
Afternoon Richard,
We're still =rying to have a final discussion with Stefan as well as track down
=ultiple 128MB or smaller SD cards to reboot the Sunnyboy inverters. =e're moving as quickly as we can in order to
execute the =onversion plan but it looks like we have to push to Monday. Dan has =hown Michael how to get the system
back up and operating in the event =f it dropping offline and that is working for the interim.
Regards,
Brian Walden
On Jun 28, 2018, at 11:08 AM, Richard Kahn =lt
<mailto > wrote:
please =onfirm that you will be at GSJ tomorrow to work on the Solar
thank you
Richard Kahn
HBRK Associates Inc.
575 Lexington Avenue 4th Floor
New York, NY 10022
7
EFTA_R1_01833718
EFTA02623906
On Jun =5, 2018, at 7:27 PM, Brian Prosolar <
wrote:
I want to ensure we have the PCB bypass discussion with the =ngineers prior to
the visit and will try to expedite.
Brian Walden
EE/RE Consultant
On Jun 25, 2018, at 5:05 PM, Richard Kahn =It
<mailto: > wrote:
we are =ithout any solar currently
can you please try to have dan come sooner
thank you
Richard =ahn
HBRK Associates Inc.
575 Lexington Avenue 4th Floor
New York, NY 10022
On Jun =5, 2018, at 4:31 PM, Brian Prosolar <
wrote:
Afternoon =ichard,
I have Dan on the =chedule to head to GSJ on Friday.
Regards,
8
EFTA_R1_01833719
EFTA02623907
Brian Walden
ProSolar America, =lc
Dir. =1Operations
On Jun 25, 2018, at 3:30 PM, Richard Kahn =lt
<mailto: > wrote:
can you please advise when your men can come =n and fix our solar system
thank you
Richard Kahn
HBRK Associates Inc.
575 Lexington Avenue 4th Floor
New York, NY 10022
<401A334B1BB040D0BBA29AA3089AB844[4315691.jpg>
<=div>
9
EFTA_R1_01833720
EFTA02623908
Prosolar Systems
Caribbean: 340.201-4752
Florida: =50-222-3554
Let's Get Social
10
EFTA_R1_01833721
EFTA02623909
ℹ️ Document Details
SHA-256
62a4a40f22b80b06e1db7e7aa650a56736bb4c06d079992262504c8bd8f2ff3c
Bates Number
EFTA02623900
Dataset
DataSet-11
Type
document
Pages
10
💬 Comments 0