EFTA00795910
EFTA00795911 DataSet-9
EFTA00795913

EFTA00795911.pdf

DataSet-9 2 pages 641 words document
P17 V11 P18 V16 P19
Open PDF directly ↗ View extracted text
👁 1 💬 0
📄 Extracted Text (641 words)
Gulfstream OSSISSAL DYNAMICS COMPANY Company: JEGE. LLC Date: 05 February 2019 Aircraft Model: GIV Serial Number: 1085 Reg. Number: N120JE ID #: 6000455 R00 Dear Mr. Visoski, In response to your request, Gulfstream is pleased to provide the following estimate. Gulfstream's estimate provided herein is for planning purposes only and does not constitute a firm or binding commitment on the part of Gulfstream Aerospace Corporation. Additionally, Gulfstream does not represent this as an offer for acceptance and will not contract for accomplishment of the efforts/work/material based solely upon this estimate. Should you require a formal proposal after your review of this estimate, please contact your Regional Sales Manager, Rusty Cramer (mobile: i or email: Please Note: • Lead and downtime noted are for individual items only; actual lead and downtime will be determined after final workscope has been defined. • Estimated amounts provided herein are valid within the current year of the date of this estimate. • This estimate is based on work being performed at a Gulfstream United States Service Center. Estimated Workscope Description Amount ASC 502 ADS-B Out V1 to V2 Upgrade • The existing Rockwell Collins transponders will be upgraded for Aircraft Dependence $24,000 Surveillance-Broadcast Out (ADS-B Out) RTCA DO-260B to Part Number 622-9210-501. • Scheduling note: This item is a managed program; estimated downtime 15 - 20 working days. ASC 477A (Triple NZ) FMS 6.1 Upgrade • ASC 477A upgrades existing NZ 2000 Flight Management Systems (FMS), via installation of version 6.1 software, to an NZ 2010 system with SBAS/LPV GPS upgrade. $210,000 • This ASC may only be installed at Gulfstream Aerospace approved facilities. • Scheduling note: This item is a managed program: estimated downtime 10 working days. FANS-1/A+ Installation • Install the integrated Honeywell MKIII Communications Management Unit (CMU) (AGARS/FANS 1/A+) system to include the unique Global Data Center (GDC) OPS, Airline Modifiable Information and Honeywell Generated Information (HGI) software's to support FANS 1/A+ operation. This $375,000 current production Honeywell MKIII ACARS/FANS VA+ CMU unit is a replacement to the current Honeywell AFIS DMU system plus has FANS 1/A+ Operational capabilities. • Scheduling note: This item is a managed program: estimated downtime 15 working days. Optional: FANS 1A + Printer • Install optional Astro-Med printer and interface with new Honeywell MKIII ACARS/FANS 1/A+. • Notes: • Installation of Astro-Med printer must be accomplished in conjunction of FANS 1/A+. $17,000 • Any equipment relocation to support STC'd printer installation will be time and material or quoted separately upon request. • Scheduling note: This item is a managed program: estimated downtime 10 working days. GEC rev 04 03 2018 Par 1 oft PROPRIETARY NOTICE THIS DATA AND INFORMATION CONTAINED HEREIN IS PROPRIETARY DATA OF GULFSTREAM AEROSPACE CORPORATION. NEITHER THIS RFP NOR THE DATA CONTAINED HEREIN SHALL BE REPRODUCED. USED. OR DISCLOSED TO OTHERS WITHOUT THE EXPRESS WRITTEN AUTHORIZATION OF GULFSTREAM AEROSPACE CORPORATION. EFTA00795911 Gulestreaniv A NNNNNN L CANAPAICS COOMPANIf Company: JEGE, LLC Date: 05 February 2019 Aircraft Model: GIV Serial Number: 1085 Reg. Number: N120JE ID #: 6000455 R00 Estimated Workscope Description Amount FANS Over Iridium (FO1) Installation • One (1) TrueNorth DLU will be installed in the forward vestibule area (following an engineering evaluation of available space) and interfaced with the proposed/existing Honeywell MKIII Communications Management Unit (CMU); installed as part of the FANS-1/A+ solution. $90,000 • One (1) (dedicated) dual-element Iridium antenna will be installed for the DLU. • FANS 1A Installation ST04036AT-D is a prerequisite or concurrent requirement for this installation. • Scheduling note: This item is a managed program; estimated downtime 10 working days. GAO rev 04 03 2018 Page 2 012 PROPRIETARY NOTICE THIS DATA AND INFORMATION CONTAINED HEREIN IS PROPRIETARY DATA OF GULFSTREAM AEROSPACE CORPORATION. NEITHER THIS RFP NOR THE DATA CONTAINED HEREIN SHALL BE REPRODUCED. USED. OR DISCLOSED TO OTHERS WITHOUT THE EXPRESS WRITTEN AUTHORIZATION OF GULFSTREAM AEROSPACE CORPORATION. EFTA00795912
ℹ️ Document Details
SHA-256
6350fed2302c1fbd89a067145325402bd08609ef7e052994909051f66edf261c
Bates Number
EFTA00795911
Dataset
DataSet-9
Document Type
document
Pages
2

Comments 0

Loading comments…