EFTA01010894.pdf

DataSet-9 2 pages 690 words document
👁 1 💬 0
📄 Extracted Text (690 words)
From: LSJ GSJ To: J Epstein <[email protected]> Cc: michael lidden , Brice LSJ , Kyle reavis , Richard Kahn Subject: Re: DPNR visit of 12-20-18 Date: Thu, 20 Dec 2018 21:44:29 +0000 Good Afternoon I have little to add to explanation of events of GSJ today, other than to fill in the time when Mike returned to the beach. I did ask if they have any paperwork for the stop work and was informed this was verbal and was to be followed. A couple of times I mentioned that my understanding was that they were to remain on the beach line, they made it very clear that they could go wherever they please. Kyle and I where ahead of the group at this point, after reaching the top of the hill they past us, taking photos and videos of the area as noting in the videos that I will forward. I was asked a question about the sand on top of the hill, my explanation is on the video. They continued making a left turn towards the Q Hut and Staff Cottage, they did not enter any of these buildings, but did take photos and videos. They did not ask one question while at this area, then continued down the road to the beach and as mentioned by Mike noticed intake pump housing etc Before leaving they reconfirmed that no work was to continue until someone came to their office and received a permit. I will forward the video's,which sorry to say will need to come in small batches, they were taken on my phone, a little broken up as I received a number of calls over this time period If you require any further information please let me know Warmest regards Karen On Thu, Dec 20, 2018 at 2:29 PM michael glidden < > wrote: On 12-20-18 DPNR arrived on GSJ just after 12:00 noon and proceeded to dock their boat and 4 members of the party walked across the beach to the tiki area with another staying on the boat. Karen, Kyle and myself arrived just after 12:30 and introduced ourselves. The DPNR people asked about permits for the work going on at the beach and if there was any other work under way elsewhere on the island. They then told us that they did not need any written orders to both instruct us to cease and desist any and all construction or to allow them to access any portion of the island they chose to go to. At that point they started walking west down the beach and stopped at the equipment parking area at the far west end of the beach and took pictures of the area and likely the excavated hole for the new septic treatment plant and the tanks sitting next to the hole. Then they headed along the road leading to the dump/dumpster area and took photos of the newly excavated trash pit and the freshly scrapped area with the boat trailers and water wagons parked there. At that point they walked down to the Christmas Cove barge ramp area and took photos of that area. After walking back up to the dump area they chose to walk up the road that climbs the hill behind the old ruins building and leads to the Q Hut and staff cottage. I did not follow them at that point as Kyle and Karen were ahead of them in a cart. I walked back to the beach until they got back down there. As they were walking back to the tiki from the east end of the beach they took notice of the intake pump housing for the desal unit and also the freshly laid sand over the area that had previously been grass. Karen asked to see the lead person's ID and was asked to show hers also. As they were getting back onto their boat one of the officers boarded the Zodiac and took pictures of the registration sticker. After that they all boarded and left the island. EFTA01010894 The St. James Group 6100 Red Hook Quarter Suite B3 St Thomas USVI 00802 EFTA01010895
ℹ️ Document Details
SHA-256
646cef7ad2138674395e4a876c1475eeaddccd3141f9a1a04e14b3049d80937f
Bates Number
EFTA01010894
Dataset
DataSet-9
Type
document
Pages
2

Community Rating

Sign in to rate this document

📋 What Is This?

Loading…
Sign in to add a description

💬 Comments 0

Sign in to join the discussion
Loading comments…
Link copied!