Sent Monde A 4 2015 9:46:23 PM
From: Lvjet < >
To: jeevacation©gmail.com
Subject: Fwd: BBJ
—Original Message
From: Altuna, Pair" <
To: Larry Visoski <
Sent: Fri, Nov 28, 2014 3:52 pm
Subject: RE: BBJ
Larry
I am in receipt of your e-mail and attachments.
In reviewing the
current and the desired floorplana f realized the layout for the latter hardly
retains any seats, divans, furnishings, bulkheads, side-lodges or monuments in
their current cabin location.
This kind of radical floorplan change would
require quite large non-reoccurring engineering (NRE) and certification (STC)
effort.
The upper and lower supporting structure, potable, gray and waste
water plumbing, electrical (IFE/CMS/Cabin Lighting, etc), periphery (i.e.
headliners, valances and domes) system, in the current cabin layout would have
to be demoded as to allow the new cabin layout.
Not being the completion center
holding the original interior STC approved engineering data package we would
have to create the engineering data required to support the certification
process (STC) for the new configuration.
The FAA certification level is greater
today than it was in 1955, when the original interior was initially certified
(STC)
In order to salvage and reuse the existing seats, divans, furnishings,
bulkheads, side-ledges or monuments the engineering for the Installation of
these cabin elements would have to be validated.
There is the risk that many of
the cabin elements certified in the 1999 STC could not be certified in today's
regulatory environment.
In essence the BRE, labor and material costs and the
down-time time involved for the desired floorplan would be even greater than
starting with a green aircraft without an interior already in place (8-12
months down-time and $25.0 M. to $30.0 N price range) as we would have to spend
quite a bit of effort in analyzing and validating the original interior.
On
the other hand, if acceptable to your Principal, we were able to work around the
existing interior distribution layout and limit the refurbishment efforts to
incorporating new materials and design features we would be 1n the 4-8 months
down-time and $5.0 M to $7.0 M budgetary price range.
Thanks and Best
Regards!
Pat ricio
Patricia Altuna
Executive vice President Sales 4
Marketing
Associated Air Center
8321 Lemmon Ave
Dallas, TX,
75209
U.S.A.
Office:
Mobile:
www.ntandflrdnoto.crrn
EFTA_R1_00035242
EFTA01743679
'The trusted service partner•
Disclaimer:
This email, including
attachments, is confidential and intended solely for the use of the
individualisl to whom it is addressed. If you are not the intended recipient, be
advised that you have received this email in error and that any use,
dissemination, forwarding, printing, or copying of this email is strictly
prohibited. If you have received this email in error, please contact the sender
and then delete it from your system. Although this email and any attachments are
believed to be free of any viruses or other defects, it cannot be guaranteed to
be secure and error free as it can be intercepted, amended, lost or destroyed.
Dubai Aerospace Enterprise (DAE) Ltd and StandardAero accept no responsibility
for any loss or damage arising in any way from its receipt or use.
Original Message
From: Larry Visoski Imailto:
Sent:
Friday, November 28, 2014 1:20 PM
To: Altuna, Patricio
Subject: BSI
Hello
Mr Altuna,.
As per our conversation on Wednesday, please find attached the
original floor plan and a wish list floor plan, that la open to suggestions ?
Budgetary number for a project of this magnitude at your earliest
convenience
Thank you
larry Visoski
JEGE Inc
3800 Southern Blvd. Suite
204, west lm beach FL 33406
cell
EFT&R1_00035243
EFTA01743680
ℹ️ Document Details
SHA-256
6581e6ad18a2a763f3e3b9f77b2c8bd34748bd280c679987ecf103549a77184a
Bates Number
EFTA01743679
Dataset
DataSet-10
Document Type
document
Pages
2
Comments 0