From: Craig Martin
Sent: Monday, April 23, 2012 9:35 PM
To: Jeffrey Epstein
Subject: Re: Staffing Guide
Great
Thanks
Craig
From:=/b> Jeffrey Epstein cieevacation@gmaitcom>
To: Craig Martin Sent: Monday, April 2=, 2012 5:31 PM Subject:</=> Re: Staffing Guide
<=iv class extra">you and i will discuss tomoorow.. I =gree, i am not sure why we need a new
shed. . plus plus
On Mon, Apr 23, 2012 at 5:29 PM, =raig Martin wrote:
Here is a proposed draw down of =taffing. As construction ends we will have to retrain staff to fit into th=ir new
roles.
This does not take into account re=raining the boat captains to preform other duties as yet.
=OA
=OA
Boat Captains
2
=OA 2
=OA
Boat Mate 1
c/=d> 1
5
3
2
EFTA_R1_00080368
EFTA01769612
<=td>
=Head Grounds Man 1 =
1
1
<=td>
7
7
5 =/tr>
=OA
Housekeeping =4
3
3
Part Time Housekeeping
1
1
=br>
=
Total 25
=21
18</=d>
2
EFTA_R1_00080369
EFTA01769613
F
Jeffery;
=div>Here are some thoughts on support staffing.
=OA
Engineering/Maintenance
For =iscussion only;
As discussed most o= the islands staffing is now involved in construction not on island main=enance. As the
construction winds down the staff in engineering, mainten=nce and marine services should have more time to perform
their permanent=jobs. If we can teach them to multi-task we should be able =o shrink the staff.
Between enginee=ing and maintenance there are currently 9 people. Marine services has 3p= plus the head
engineer position (Arran), makes the total s=pport staff 13pp. This is an extremely large support staff for the islan=.
Management is currently looking a= the staffing by who is there and how they fit into the current/new staf=ing
structure. We need a new structure. If you look at the staffing from=a larger/different prospective, though, you would
have a smaller staff t=at is trained in multi areas. We need more out of the box t=inking. To get to this point the current
staff might have to be retrained =r replaced. This may take several months to accomplish but could be done= We need a
new org chart in this area.
Examples;<=div>
Maybe there is a marine mechanic that =s the second boat driver who also runs the RO plant and is =he island
mechanic. When the island stops maintaining construction equip=ent and much of the equipment leaves the island and
there is fewer boats=0Ato maintain, this may be possible.
Head Engineer that is also a carpenter or a plant operator.
Painter/ Carpenter/maintenance combined.=/div>
Electrician/ plant operator/irrigat=on (electronic side) technician.
Structure;=/div>
Currently engineering reports to Aaran, maint=nance to Brice, marine to both.
Future; There should be =ne person to handle all. They can then supervise all support staff and d=ploy them as
needed. Landscaping might want to fall here also.
=OA
Areas of work/Buildings. Although t=is may sound trivial I do not believe the staff should be spread out in = or 4
different buildings. This makes is very difficult to supervise them=0Aand to have them multi task .
Currently, ca=pentry is in the building by the dock, electricians in the RO building, mechanics in the shed and
management in a separate building.=lt is almost impossible to manage and supervise the staff that way.
All the work spaces are over sized and could be smaller and m=re efficient if redesigned correctly. I would also
avoid walls and use mor= fencing/windows where possible. You need to be able to see the staff wo=king.
Example (for discussion)
In the RO building have a carpenter shop, paint, e=ectrical, plumbing and a glass enclosed managers office. I
believe this =ay fit.
To accomplish this;
3
EFTA_R1_00080370
EFTA01769614
Quads would go=to dock side building.
Storage to dock side building.
Electrical shop to shrink.
Engineering storage =o the two empty generator bays.
The=proposed new metal building would be a great asset but if you do not wan= to spend $250,000 on the
building you could;
Clean up cur=ent mechanics building.
Throw out much of the material the=e.
Keep sensitive equipment/machinery in dockside building= There are 3 more containers in that building using
valuable space as we=l as a large carpenter shop, large marine services shop that would have =o be re
purposed/moved/reconfigured.
=OA
Larger equipment would be kept in current engineering shed/struct=re.
These are just some ideas for d=scussion.
The point is the way the=support staff is currently structured will lead to a larger staff than y=u want. I believe
we should start with making the physical plant more ef=icient and then reducing the staff.
=OA
Craig
=br>--
=OA The information contained in this communication is
confidential, m=y be attorney-client privileged, may
constitute inside information, and=is intended only for
the use of the addressee. It is the property of
Unauthorized use, disclosure or copying of this<=r>communication or any part thereof is strictly prohibited
and may be u=lawful. If you have received this
communication in error, please notify=us immediately by
return e-mail or by e-mail to [email protected] <[email protected]> , and
destroy this com=unication and all copies thereof,
including all attachments. copyright =all rights reserved
</=lockquote>
The information contained in this com=unication is
confidential, may be attorney-client privileged, may
=0Aconstitute inside information, and is intended only for
the use of th= addressee. It is the property of
Jeffrey Epstein
4
EFTA_R1_00080371
EFTA01769615
Unauthorized use,=disclosure or copying of this
communication or any part thereof is stri=tly prohibited
and may be unlawful. If you have received this
com=unication in error, please notify us immediately by
return e-mail or by=e-mail to [email protected]<=a>, and
destroy this communication and all copies thereof,
includ=ng all attachments. copyright -all rights reserved
<[email protected]>
5
EFTA_R1_00080372
EFTA01769616
ℹ️ Document Details
SHA-256
663cc5c1b2fc7cc6794a80041b2d75ed95f4056df8c5b6853b4c996705d92e99
Bates Number
EFTA01769612
Dataset
DataSet-10
Document Type
document
Pages
5
Comments 0