EFTA01787020
EFTA01787021 DataSet-10
EFTA01787023

EFTA01787021.pdf

DataSet-10 2 pages 233 words document
P17 V16 P23
Open PDF directly ↗ View extracted text
👁 1 💬 0
📄 Extracted Text (233 words)
From: brice gordon Sent: Wednesday, December 7, 2016 1:11 AM To: Jeffrey E. Cc: Rich Kahn; LSJ GSJ Subject: Re: LSJ Staff Cottage Material Cost Jeffrey The Scope of Work for the=Cottage is as follows Remove 3 sliding exterior doors, =ew flashing, install new doors Demo bedroom addition, and=restore to previous Screened in Deck This includes new railing a=d decking for tile Demo front Decking, install decking for Tile =nstall Frame, Flash, Roof, and install front addition =heet Rock living room/kitchen and new addition Remove original S=ltillo Tile, and install 2500 Sqft of New Tile Install new Kitch=n Cabinets and fit new Appliances Work to be perf=rmed In House Assist in delivery of Material and clean up <=iv>Paint, small plumbing and electrical I have ap=roached David to do the work, he was involved in the last basic renovation=of the cottage and knows the structure well He has proposed the =ollowing David and a Helper 8 weeks, 6 day weeks,=7am to 4pm Labor cost $20672.00 Start work 19th Dec Do we have your approv=l to proceed. regards Brice <=iv> Ok On Sun,=Dec 4, 2016 at 10:39 AM brice gordon <mailto wrote: Jeffrey attached is estimated material cost for cottage renovation this does not include applianc=s, cabinets and counter tops I have someone for the work, working on labor cost. regards <=iv class="m_-1332982785923280534gmail_msg"> Brice Gordon EFTA_R1_00110120 EFTA01787021 =div class="gmail_signature" data-smartmail="gmail_signature"> Brice Gordon 2 EFTA_R1_00110121 EFTA01787022
ℹ️ Document Details
SHA-256
6657bf81661c37e22c9fe8b4d66ecd85ff22633232f53a3e916370c18f847acc
Bates Number
EFTA01787021
Dataset
DataSet-10
Document Type
document
Pages
2

Comments 0

Loading comments…
Link copied!