EFTA02614532.pdf
👁 1
💬 0
📄 Extracted Text (270 words)
From: brice gordon sommu >
Sent: Sunday, November 11, 2018 6:17 PM
To: J
Subject: Re: LS1 RO Fiber
Thank you
Sent from my iPhone
On Nov 1=, 2018, at 9:21 AM,1 <[email protected] <mailto:[email protected]» wrote:
ok
On Sun, Nov 11, 2018 at 11:11 AM brice gordon •; => wrote:
=div class="gmail_default" style="font•size:small">Hello Rich
=div class="gmail_default" style="font-size:small">
Cost:$2753.69
Rogers Electric for Conduit. </=iv>
Cost:$7520.43 plu= shipping
adiv>
Estimated Cost: $=0,274.12
<=r>
We are unable to Pull New Fiber in the the Existing Conduit &n=sp;from the Generator Building to Sea Water
Intake Pump Controls. The fiber=connection allows the RO Plant to communicate to the Sea Water Intake
Pumps=located outside the Tunnel.
The conduit is for the Duct Bank, to b= dug from the Generator Building out to the Sea Water Intake building,
&nbs=;with a new feeder for GSJ.
At this time the Sea Water Intake pum=s are being run in Manual Mode.
LSJ will Dig, Install conduit and=Pull Fiber.
Can we proceed with ordering Fiber and=Conduit?
regards
Brice Gordon
The Saint lames Group
USVI
Ph:
</=iv>
EFTA_R1_01813001
EFTA02614532
&nb=p; please note
The information contai=ed in this communication is
confidential, may be attorney-client privile=ed, may
constitute inside information, and is intended only for
the u=e of the addressee. It is the property of
JEE
Unauthorized use, discl=sure or copying of this
communication or any part thereof is strictly pr=hibited
and may be unlawful. If you have received this
communication i= error, please notify us immediately by
return e-mail or by e-mail to [email protected]=m <[email protected]> , and
destroy this communication and all copies thereof,
includi=g all attachments. copyright -all rights reserved
2
EFTA_R1_01813002
EFTA02614533
ℹ️ Document Details
SHA-256
66e7031cbe2d40a83b83083b1ac371482eed40af78f093e7242010a649db59a3
Bates Number
EFTA02614532
Dataset
DataSet-11
Type
document
Pages
2
💬 Comments 0