To: TOM MELNICK Brice Daphne
Wallace
From: Jeffrey Epstein
Sent Fri 1/13/2012 11:59:41 AM
thanks for photos, First I see steps to compass poured and not designed by me .. PLEASE do
not do any work without design input.. I entry bands to courtyard ( should be done by omar ,
or if not the same as the far east one with sand 2.. we were supposed to try painting shine on the
rocks, 3. I need to see the gates bill adams should be building. 4. it appears the berm should be
higher. 5. peter should add pebbles to the bottom of the waterfall so it looks as if they pour into
the pond.. ( this can wait until week of 23), tree replacement . ?? the ballet and yoga room. 6 are
the generators on shock absorbers or siting directly on concrete? , the walls need cheap acoustic
tile or spray, we should buy a stereo rack, for the flapole pool . and please have someone put a
lock on my bedroom door.
******* *************** ******** ****** ********** ************
The information contained in this communication is
confidential, may be attorney-client privileged, may
constitute inside information, and is intended only for
the use of the addressee. It is the property of
Jeffrey Epstein
Unauthorized use, disclosure or copying of this
communication or any part thereof is strictly prohibited
and may be unlawful. If you have received this
communication in error, please notify us immediately by
return e-mail or by e-mail to jeevacationagmail,com, and
destroy this communication and all copies thereof,
including all attachments. copyright -all rights reserved
EFTA_R1_00241151
EFTA01849213
ℹ️ Document Details
SHA-256
67005bd58c415f7da0c6230254044877d8cbd19839a8a93653d650e3c6dd326c
Bates Number
EFTA01849213
Dataset
DataSet-10
Type
document
Pages
1
💬 Comments 0