EFTA02612755.pdf

DataSet-11 2 pages 485 words document
👁 1 💬 0
📄 Extracted Text (485 words)
From: Kyle reavis Sent: Monday, December 3, 2018 9:54 PM To: jeffrey E. Cc: brice gordon; Richard Kahn Subject: Weekly Schedule Good Aft=rnoon, The counter top su= contractor has not started cutting the tops yet. Jay is reaching ou= to the two guys on island who have the machine to cut this material to se= what their prices would be to complete that scope of work. The rema=ning items on shedule this week are below. Still no call or email from Jeremy from Bluewater. = spoke to him at 1130 today and he was supposed to send me an email summar= of the pricing he is currently working on, but I haven't received it =et. Called at 345 with no answer, sent follow up email requesting th= information. Weekly Schedule Construction-<=iv> GSJ Staff Cottage- Framing in Progress (wall= 2 of 4 up) Framing will happen all week (walls- roof - new de=king) site de-watering (Pump did not work have to get smiley =ver tomorrow to fix-no suction) This needs to be dewatered for=sealant on cistern and before we backfill Sealing of cistern =s scheduled for this week Cabana 1-4- =ul> • Interior Tile Punchlist - 2 weeks total • Shower doors are ex=ected onsite Thursday and begin install Friday (4 days) • Gro=t reworking (1week) • seal grout (2 days) after final tile done4>=A0 • Paint newly installed EIFS " Remove and reinstall selecte= floor tiles (recut for drains) Window Installation • Next week Final cleaning of site Area Gym- • 4 days of work ending on Friday • Window Installer was onsite t=day to view the work and make sure he had all parts and pieces before star=ing (Were missing the tracks for the sliding doors, Brice found them in th= back of the RO building by 4 wheeler) • Windows start tomorrow morn=ng then after all 5 are installed moving on to doors Chillax= EFTA_R1_01809349 EFTA02612755 * needs to be painted by TJ and LS1 painters (this =eek) - Plaster all done - Area ready Main Compound Coral Sto=e- (And few tiles in Pops Garden) " Tile demo starte= today * ALL TILE is to be removed and documented by JPK p=ior to tile installation so there are no questions on the areas worked on =r the exact number of tiles worked on 3 days of demo and prep=- then move into installation Main Compound EIFS Work- =ul> " JPK will not start without approved pricing (from Jay at 2 pm today= I instructed Jay via phone and Email to send over prici=g for these repairs on the main compound areas Tiki GS= - * Brian is putting up new beams (working on this =oday) for the roof support * He has a new drawing showing additi=nal columns in front and back that he told me came from you during your la=t visit (please confirm) Very Respectfully, Kyle Reavis =/div> 2 EFTA_R1_01809350 EFTA02612756
ℹ️ Document Details
SHA-256
67507489781b6adb4985813d2f9455641ffa91df7984919e35968e83761852a4
Bates Number
EFTA02612755
Dataset
DataSet-11
Type
document
Pages
2

Community Rating

Sign in to rate this document

📋 What Is This?

Loading…
Sign in to add a description

💬 Comments 0

Sign in to join the discussion
Loading comments…
Link copied!