From: Kyle reavis
Sent: Monday, December 3, 2018 9:54 PM
To: jeffrey E.
Cc: brice gordon; Richard Kahn
Subject: Weekly Schedule
Good Aft=rnoon,
The counter top su= contractor has not started cutting the tops yet. Jay is reaching ou= to the two guys on island who
have the machine to cut this material to se= what their prices would be to complete that scope of work. The rema=ning
items on shedule this week are below.
Still no call or email from Jeremy from Bluewater. = spoke to him at 1130 today and he was supposed to send me an
email summar= of the pricing he is currently working on, but I haven't received it =et. Called at 345 with no answer, sent
follow up email requesting th= information.
Weekly Schedule Construction-<=iv>
GSJ Staff Cottage-
Framing in Progress (wall= 2 of 4 up)
Framing will happen all week (walls- roof - new de=king)
site de-watering (Pump did not work have to get smiley =ver tomorrow to fix-no suction)
This needs to be dewatered for=sealant on cistern and before we backfill
Sealing of cistern =s scheduled for this week
Cabana 1-4-
=ul>
• Interior Tile Punchlist - 2 weeks total
• Shower doors are ex=ected onsite Thursday and begin install Friday (4 days)
• Gro=t reworking (1week)
• seal grout (2 days) after final tile done4>=A0
• Paint newly installed EIFS
" Remove and reinstall selecte= floor tiles (recut for drains)
Window Installation
• Next week Final cleaning of site Area
Gym-
• 4 days of work ending on Friday
• Window Installer was onsite t=day to view the work and make sure he had all parts and pieces before star=ing
(Were missing the tracks for the sliding doors, Brice found them in th= back of the RO building by 4 wheeler)
• Windows start tomorrow morn=ng then after all 5 are installed moving on to doors
Chillax=
EFTA_R1_01809349
EFTA02612755
* needs to be painted by TJ and LS1 painters (this =eek) - Plaster all done - Area ready
Main Compound Coral Sto=e- (And few tiles in Pops Garden)
" Tile demo starte= today
* ALL TILE is to be removed and documented by JPK p=ior to tile installation so there are no questions on
the areas worked on =r the exact number of tiles worked on
3 days of demo and prep=- then move into installation
Main Compound EIFS Work-
=ul>
" JPK will not start without approved pricing (from Jay at 2 pm today=
I instructed Jay via phone and Email to send over prici=g for these repairs on the main compound areas
Tiki GS= -
* Brian is putting up new beams (working on this =oday) for the roof support
* He has a new drawing showing additi=nal columns in front and back that he told me came from you
during your la=t visit (please confirm)
Very Respectfully,
Kyle Reavis
=/div>
2
EFTA_R1_01809350
EFTA02612756
ℹ️ Document Details
SHA-256
67507489781b6adb4985813d2f9455641ffa91df7984919e35968e83761852a4
Bates Number
EFTA02612755
Dataset
DataSet-11
Type
document
Pages
2
💬 Comments 0