📄 Extracted Text (680 words)
From: J <jeevacation®gmail.com>
To: brice gordon •
Subject: Re: Ken - 6 pm - December 13, 2018
Date: Fri, 14 Dec 2018 02:53:21 +0000
not sure what custom install means. in a vanity , but i leave it to you
On Thu, Dec 13, 2018 at 7:56 PM brice gordon > wrote:
Respectfully
Sony but this is a custom install
Let me go to Kenny tomorrow
Please do not send Daphne again this does not seem to be helpful !!
Will address in the morning
Thank you
Sent from Mars
On Dec 13, 2018, at 7:48 PM, J <jeevacation®gmail.com> wrote:
hups://www.homedepot.com/p/Avanity-31-in-x-22-in-Vitreous-China-Vanity-Top-with-Rectangular-Bowl-
in-White-CI1T3IWT/202831380 i dont knopw the right size but lets get it in and done.
On Thu, Dec 13, 2018 at 6:54 PM Daphne Wallace <I wrote:
Greetings Sir,
The first slab is now cut into 3 pieces. These pieces each represent 1 counter-top of a Cabana - per Ken
Cabana 1, 2, and 3. Ken told me that in the morning, he will cut the second slab into 3 pieces, and those
are the pieces for Cabana 4 and 5. I said to Ken, "you mean Cabanas 1, 2, 3, 4 and the Flagpole?" He
wasn't sure - he then said, the Cabanas and the kitchen.
Ken explained that he was waiting to hear back on the blade to complete the miter cuts. He told me that he
also has to cut narrow strips that will then be joined to the counter-top slab and will finish the edges.
I then said, "So, you will cut the hole for the sinks when you get to the island on Saturday?", and Ken told
me that this - what I am looking at tonight and tomorrow - is Phase 1 - these are the tops for the cabinets
under the window.
Phase 2 will be later - when he returns to the island to install these countertops, Ken will take the
measurements for the vanity tops, and then he can cut the vanity tops from the slabs. He said when he was
last there the vanities were not installed.
I told Ken the vanities were installed, have been installed. I asked Ken what time he intended to be at his
shop in the morning. He said from 7 am, then he had to leave at 11 for an appointment. He told me when I
come by tomorrow afternoon the miter cuts will be completed.
I told Ken I will come by in the morning on my way to the office.
EFTA01013636
To summarize:
10:40 am - Ken and assistants unpacking slab number one to place on the work table
12:00 pm - Slab #1 is one the table - Ken is attempting to begin the miter cutting
3:00 pm - Slab #1 miter cutting is a no go - Ken and assistants are a no show
6:00 pm - Slab #1 is cut twice to create 3 equal pieces - I witness Ken make the second cut - (4-5 minutes,
while we talked)
Respectfully,
Daphne
please note
The information contained in this communication is
confidential, may be attorney-client privileged, may
constitute inside information, and is intended only for
the use of the addressee. It is the property of
JEE
Unauthorized use, disclosure or copying of this
communication or any part thereof is strictly prohibited
and may be unlawful. If you have received this
communication in error, please notify us immediately by
return e-mail or by e-mail to [email protected], and
destroy this communication and all copies thereof,
including all attachments. copyright -all rights reserved
please note
The information contained in this communication is
confidential, may be attorney-client privileged, may
constitute inside information, and is intended only for
the use of the addressee. It is the property of
JEE
Unauthorized use, disclosure or copying of this
communication or any part thereof is strictly prohibited
and may be unlawful. If you have received this
communication in error, please notify us immediately by
return e-mail or by e-mail to [email protected], and
destroy this communication and all copies thereof,
including all attachments. copyright -all rights reserved
EFTA01013637
ℹ️ Document Details
SHA-256
69490e7d6bdb6df726523b6f0f9c31fda37eec14735d913575d9ed738b43545a
Bates Number
EFTA01013636
Dataset
DataSet-9
Document Type
document
Pages
2
Comments 0