Subject: Fwd: E-7871-S Artesian Variance
Attachments: Figure2.pdf; Untitled attachment 00314.htm; Figure2B.pdf; Untitled attachment
00317.htm
Recommend the simpler appr=ach
Plse advise
Sent from my iPhone
Begin fo=warded message:
From: Ca=ey Cook =r>Date: June 20, 2012 11:22:28 AM
GMT-04:00
To: brice gorthn
Subject: E-7871-S Artesian Variance
Brice G.;
As we discussed, I spoke to David Anderson at OSE regarding the=artesian construction variance for well
E-7871-S. Mr. Anderson has re=iewed the artesian variance request package we sent on June 4, 2012. =he package is
currently under review by others in his office, and he expect= that a decision on the variance request will be returned in
the next week o= two.
He suggested that the annular seal and grout above the s=reen could be modified to simplify
construction. Recall that during a=phone conversation with Mr. Anderson in March 2012 we discussed t=e OSE concern
with potential interaquifer exchange along the borehole annul=s in the proposed well. To address the concern, we
agreed to install m=ltiple annular bentonite seals above the screen. Now that he has the f=ll hydrologic picture provided
in the variance request, he agrees that a si=gle bentonite seal above the screen with Quik Grout installed in the annulu=
above the bentonite (and below the cement surface seal) will be adequate t= prevent any fluid exchange along the
borehole. The attached figures s=ow the original plan with multiple seals (Figure 2) and the revis=d plan with a single
seal (Figure 28). The change would streamline we=l construction; bentonite seals must be left undisturbed after
install=tion for one to three hours to hydrate. Eliminating two seals wo=ld save up to six hours of construction/standby
time. I have a call i= to Bill Whaley to find out whether the change would reduce his estimated d=illing costs.
Mr. Anderson indicates that an email to him proposing th= change would be adequate for him to
incorporate it into the variance reque=t. I would also send attached Figure 2B for clarity.
I recommend moving ahead with a single bentonite seal as shown in=Figure 2B to streamline well
construction. Please let me know if you want t= proceed this way, or call if further discussion is needed.
EFTA_R1_02061554
EFTA02699339
=div> --
Casey W. Cook, P.E.
Balleau Groundwater, Inc.
901 Rio Grande Blvd. NW
Suite F-242
Albuquerque, NM 87104
2
EFTA_R1_02061555
EFTA02699340
ℹ️ Document Details
SHA-256
6996cb5028be136cad1792c028ebd9d7a3f40a94777af6b1b9c7f873ed65aea6
Bates Number
EFTA02699339
Dataset
DataSet-11
Type
document
Pages
2
💬 Comments 0