IN THE SUPERIOR COURT OF THE VIRGIN ISLANDS
DIVISION OF ST. THOMAS & ST. JOHN
**************************
GREAT ST.JIM, LLC, )
) CASE NO. ST-19-CV-
Plaintiff, )
)
v. ) COMPLAINT FOR BREACH
) OF CONTRACT & FRAUD
PROSOLAR SYSTEMS, LLC, )
)
Defendant. )
)
COMPLAINT
COMES NOW, Plaintiff GREAT ST.JIM, LLC ("GSJ"), by and through its
undersigned counsel KELLERHALS FERGUSON KitoBuN PLLC, and hereby alleges and states the
following for its Complaint against Defendant ProSolar Systems, LLC:
PARTIES
1. Plaintiff Great St. Jim, LLC ("GSJ") is a limited liability company organized under the
laws of the U.S. Virgin Islands.
2. Upon information and belief, Defendant ProSolar Systems, LLC ("ProSolar") is a limited
liability company organized under the laws of the U.S. Virgin Islands.
JURISDICTION & VENUE
3. This is a civil action for breach of contract and fraud over which this Court has jurisdiction
pursuant to 4 V.I.C. § 76.
4. Venue is proper in this Court pursuant to 4 V.I.C. § 78 because St.Thomas is the judicial
division in which Defendant is located, where the action arose, where most all the witnesses
are located, and where Defendant may be served.
EFTA00807552
Great St. Jim, LLC v. ProSolar Systems, LLC Case No. ST-19-CV-_
Complaint Page 2 of 5
FACTS
5. On or about November 2016, GSJ purchased a 310.8 kWh solar power system (the "solar
power system") from ProSolar for a purchase price of One Hundred Ninety-Two Thousand
Two Hundred and Eleven Dollars ($192,211.00).
6. GSJ also purchased twelve (12) self-contained Acquion Maintenance Free Salt Water
Battery Modules (the "battery modules"), each being sold with a three (3) year warranty,
set to expire in November 2019.
7. The aggregate price of the battery modules was approximately One Hundred Fifty-Four
Thousand Three Hundred and Thirty-Eight Dollars ($154,338.00).
8. The solar power system was intended to provide continuous power to meet the energy
demands of Great St. James island on full-time basis without any interruption.
9. ProSolar assured GSJ that the solar power system would be able to function on a full-time
basis and meet the energy needs to power Great St. James island.
10. The solar power system, however, began to fail regularly and would shut down every
morning at approximately 5:00 a.m. like clockwork.
II. Every morning, a GSJ representative had to travel to the Great St. James island to turn off
the island-wide power drawing from the system so that the system could recharge.
12. Once the system recharged, it then had to reboot completely before GSJ's representative
was able to reconnect power to Great St. James island.
13. In addition, since April 2017, GJS has had to pay ProSolar Three Hundred and Fifty Dollars
($350.00) per month for monthly maintenance/service calls to address the issues with the
solar power system.
EFTA00807553
Great St. Jim, LLC v. ProSolar Systems, LLC Case No. ST-19-CV-_
Complaint Page 3 of 5
14. In September 2017, the U.S. Virgin Islands were struck by Hurricanes Irma and Maria
which devastated the territory and damaged the solar power system on Great St. James
island.
15. As a result of the storms, GSJ paid in excess of One Hundred and Eleven Thousand Dollars
($111,000.00) to troubleshoot and bring the solar power system into full operation.
16. After more than a year of paid monthly service calls and ProSolar's knowledge of the
continued reports of frequent low voltage system failures, ProSolar's tech personnel finally
opened the battery modules to examine the circuit boards therein.
17. ProSolar advised that only after it examined these circuit boards, which supply the charging
and discharging controls for each battery module, did it discover that several circuit boards
were corroded.
18. In July 2018, ProSolar attempted to implement a solution to the problem by bypassing the
circuit board, and in the process, eliminating whatever functionality they should have
provided had they been functioning properly.
19. To date, the solar power system continues to have system failures and does not meet the
energy demands of Great St. James island.
20. ProSolar has advised that although it sold GSJ a warranty, there are no replacement parts
for the corroded circuit boards and, therefore, the warranty has no utility.
COUNT I: BREACH OF CONTRACT
21. GSJ hereby incorporates all previous paragraphs as if fully set forth herein.
22. ProSolar entered into a contractual agreement with GSJ by offering to design and construct
the solar power system, in exchange, GSJ paid the full purchase price plus the cost of the
warranty on the battery modules and warranty, which was accepted by GSJ.
EFTA00807554
Great St. Jim, LLC v. ProSolar Systems, LLC Case No. ST-19-CV-_
Complaint Page 4 of 5
23. ProSolar breached its contractual obligations to GSJ by failing to, among other things,
provide GSJ with a fully functional solar power system that had no defects in its design,
circuit boards, programming, or control systems.
24. ProSolar is liable for all contractual damages as a result of its conduct as well as for all
costs, expenses, attorney's fees and interest.
COUNT II: FRAUD
25. GSJ hereby incorporate all previous paragraphs as if fully set forth herein.
26. ProSolar represented to GSJ that it could provide a fully functional solar power system with
no defects in its design, circuit boards, or programming.
27. ProSolar was well aware that it could not provide such a system and intentionally
misrepresented its ability to provide such a system.
28. GSJ was unaware that ProSolar could not deliver a fully functional solar power system that
would power all of Great St. James island.
29. Additionally, ProSolar promoted and sold GSJ a warranty to GSJ which ProSolar claimed
would cover replacement parts among other things.
30. At the time ProSolar sold the warranty, ProSolar knew it had no ability to guarantee that
any replacement parts existed or would exist in the future and, thus, the warranty was not
any sort of guarantee at all.
31. ProSolar intended for GSJ to rely on the claimed warranty for assurance and for the claimed
warranty to induce GSJ to pay ProSolar additional sums, which GSJ did.
32. Despite selling GSJ a warranty, ProSolar has been unable to warrant its product.
33. GSJ relied on the ProSolar's representations to its detriment and suffered damages
including the cost of the solar power system, the cost of the warranty, the cost of monthly
EFTA00807555
Great St. Jim, LLC v. ProSolar Systems, LLC Case No. ST-19-CV-_
Complaint Page 5 of 5
repairs, loss of use and enjoyment of the property, and the cost of having to spend hours
trouble shooting, operating, repairing the defective system.
WHEREFORE, GSJ respectfully demands judgment be entered in favor of GSJ and
against ProSolar and that GSJ be awarded the following:
a. Compensatory damages;
h. Incidental and /or consequential damages;
c. Punitive damages;
d. Statutory interest;
e. Attorney's fees and costs; and
f. Any other relief deemed appropriate.
Respectfully submitted,
DATED: February 2019
CHRISTOPHER ALLEN KROBLIN, ESQ.
AYSHA IL GREGORY, ESQ.
V.I. Bar Nos. 966 & R2040
KELLERHALS FERGUSON KROBLIN PLLC
Royal Palms Professional Building
9053 Estate Thomas, Suite 101
SUS
Email:
EFTA00807556
ℹ️ Document Details
SHA-256
6a86a993de88f96689183a6eff271dfa38525abbdc878fbe3c99decc838af349
Bates Number
EFTA00807552
Dataset
DataSet-9
Document Type
document
Pages
5
Comments 0