EFTA02433034
EFTA02433036 DataSet-11
EFTA02433037

EFTA02433036.pdf

DataSet-11 1 page 423 words document
P17 V16 P23 V11 P19
Open PDF directly ↗ View extracted text
👁 1 💬 0
📄 Extracted Text (423 words)
To: Jeffre E tein 'eevacation mail.com rom: tep en ap Inger Sent: Sat 12/26/2009 3:31:01 PM Subject: Fwd: LSJ Forwarded messa From: Stephen Caplinger Date: Sat, Dec 26, 2009 at 8:45 AM Subject: LSJ Jeffrey: It greatly concerns me that you are disappointed so 1 wanted to address your concerns. In regard to the Office Pavilion entry landscaaping, We proceeded to construction only because we felt that we had you approval. I felt that we had your approval and go ahead after we submitted the fmal design plans which were based on several preliminary concept plan submittals. You even made the comment that we don't need to show you the plans again and we should consider it approved for construction. I want to assure you that I would never proceed to construction on anything without first having your approval. On the Kite House, I know you like to see photo overlay sketches, but all we've done is conceptual floor plans & site plans. As soon as I can I'll prepare additional photo sketches for your review on the exterior views & orientation. Going forward, I want to make absolutely sure that you are happy with what we are doing and that you feel that we've given you enough design information to make decisions. I would hope that we we will be able to walk through with you the various designs when we are together with Gary on LSJ. 1 believe that we can better communicate in person and on site. In the future, I will strive to give you better design concepts that are on photo overlays and to send hard copiesin addition to email attachements. I plan on being back on LSJ during the week of 1/4/10 - 1/8/10 so we should definitely get together to walk through all of the landscape issues so that I am totally clear on your vision. I don't have any doubt that we can produce your vision on the island, I just feel we have a communication issue. Meanwhile, I am working on the Coastal Zone Management application package for the Kite House Pool, Wood Deck, Fire Pit, ATV Garage and the Tennis Court. We also plan on discussing the Boat Dock House but this is more of a Corps of Engineers issue. All of the designs in the CZM submittal can be revised later. Please call me if you have any comments or questions and I look forward to seeing you. Ste hen M. Ca lin er Ste hen M. Ca lin er EFTA_R1_01504182 EFTA02433036
ℹ️ Document Details
SHA-256
6b2f90f2eb33576cf3a5a1b461178ed2f5dc94d9d037d16beea11025a967c012
Bates Number
EFTA02433036
Dataset
DataSet-11
Document Type
document
Pages
1

Comments 0

Loading comments…
Link copied!