MAKING EVERY DROP COUNT U.S. Virgin Islands Operations
COM 6501 Red Hook Plan. Suite 201
St. Thomas. Virgin Islands 00802-1306
Dec 12, 2013
Ms. Ann Rodriquez
Little St. James Island
USVI.
Ann,
As requested, I have put together a preliminary quotation to replace the non-
functioning touchscreen on the LSJ SWRO system. Please note that the screen failed
due to what I am being told was a high pressure run event that burst three high
pressure lines on the system spraying the MC panel with salt water. It is impossible to
run the system without the screen , so I cannot say if this is the only issue with the
SWRO system, and we may or may not have further issues after we replace the TS and
restart the plant.
TOUCH SCREEN REPLACEMENT:
1. Siemens 6AV6 643-0CD01-1AX1 Touchscreen panel:
Cost: $ 3,348.80
2. Programming costs for new touchscreen:
Cost: $ 200.00
3. IT support from Gainesville during installation:
Cost: $ 435.00
4. 8 hrs. Labor for USVI Technician to install, start, and service LSJ SWRO system:
Cost: $ 800.00
TOTAL COST: $4,783.80
This is a "site specific" repair, and we will need approval and a check for the total
amount listed above before proceeding with ordering the touchscreen and
programming.
PLEASE NOTE: Any additional Labor Costs are billed out at $100.00 per hour. Any
other labor not listed above will be charged separately.
Respectfully,
Patrick Adams
USVI Operations Manager
Georgia • Florida • US Virgin Islands • British Virgin Islands • Anguilla • Turks and Caicos • Bahamas
EFTA00587648
Page 2
EFTA00587649
ℹ️ Document Details
SHA-256
6bffb25bf6de3b5facf2a1daa5bc2720a43fbb9fade26a0f37960913111da3c1
Bates Number
EFTA00587648
Dataset
DataSet-9
Document Type
document
Pages
2
Comments 0