EFTA00809841
EFTA00809851 DataSet-9
EFTA00809853

EFTA00809851.pdf

DataSet-9 2 pages 381 words document
P17 P23 V16 D4 V11
Open PDF directly ↗ View extracted text
👁 1 💬 0
📄 Extracted Text (381 words)
Construction Proposal Quantum Vision Construction LLC 8168 Crown Bay Marina Suite 505 PMB 260 St. Thomas, VI 00802 January 21', 2018 Owner: LSJE Little St. James Island, VI Project: Asphalt Pathways Paving Works Little St. James Island, VI SCOPE OF WORK: • Prepare and grade existing sub base • Eradicate and remove weeds and organic material from existing sub base. • Compact sub base to insure stability • Spread and compact 3 inches of owner-supplied aggregate base material • Apply Tack Coat prior to asphalt concrete placement • Place new 2-inch asphalt concrete pathway SPECIAL CONDITIONS: • LSJ will remove, secure, and replace all stone and other border edges. • LSJ will provide all ferry services and vehicular and equipment barging services to and from Little St. James Island. • Aggregate base will be supplied by owner. • Care will be taken throughout this project to minimally impact all existing areas on Little St. James Island that is not a part of this project. However, it is understood that some damage will occur to existing landscaped areas and contractor will not be responsible for replacement of these damaged areas while implementing normal construction procedures. • Amount of $114,000.00 will be credited to owner on behalf Betteroads Asphalt LLC. OPTIONS (NOT INCLUDED IN BASE PRICE): • As shown on drawings entitled "Little St. James RV and Pedestrian Pathway Re-Surfacing Project" and dated September 18, 2014. TOTAL BASE PRICE: $448,500.00 •Total Base Price is based on Quantum Vision Construction LLC's procurement of asphalt concretefrom the Island Roads asphalt producing plant. Little St. James Island Paving Page I of2 EFTA00809851 Construction Proposal Project Table: Name Description Quantity Unit Cost Unit Total Cost Asphalt Concrete 2-inch pathway 1.500 S350.00 Ton 5525.000.00 Paving 3-inch course using owner Excavation and supplied aggregate base 11080 515.00 S.Y. $37.500.00 Sitework material. Intervention amount on behalf Credit 1 -$114.000.00 -5114.000.00 of Betteroads Asphalt LLC Total Base Price $448,500.00 Options Drainage Measures: As shown on drawings entitled "Link St. James RV and Pedestrian Pathway Re-Surfacing Project" and dated September 18. 2014. Concrete Swales Described above 32 S1.064.00 EA $34.048.00 Aggregate Base Described above 32 S182.00 EA 55.824.09 Pad Rip Rap Detention Described above 32 $202.00 EA 56.464.09 Area Options Total $46,336.00 Little St. James Island Paving Page 2 of 2 EFTA00809852
ℹ️ Document Details
SHA-256
6e43c7217b441e3ec02ad15782f13547e1e4f36e9985bc18599dc9054105c20f
Bates Number
EFTA00809851
Dataset
DataSet-9
Document Type
document
Pages
2

Comments 0

Loading comments…