Michael J. Glidden
Electrical Services
4716 Estate Mafolie #12
00802
4-4-12
To: Tom Malnick
Brice Gordon
Re: 5 Palms Feeder
Gentlemen,
Good Morning. This letter is in response to your request for an alternate quote regarding
power for 5 Palms. The alternative you requested was to extend the existing Flag Pole
Pool Feeder. That feeder is roughly 2,500' long as it lies now. That length takes into
consideration that it starts at the Mechanical Building Switchboard. The Switchboard
being the absolute center of electrical distribution for the island.
The existing Flag Pole Feeder was sized to feed expected loads and have the ability to
accommodate small additional loads (misc. landscape lighting).
To extend this feeder to 5 Palms would add another 1,950' of length to feed what should
be a 100 amp service at 5 Palms. The combination of length, existing wire size and
exsisting load already being fed eliminate the possibility any further extension of the Flag
Pole Feeder.
My proposal of 2-14-12 outlines a scope that basically replicates a `Flag Pole Feeder' for
the other side of the island and stays within acceptable lengths utilizing the Mechanical
Building Switchboard as the heart of electrical distribution for the island.
Another explanation would be if you needed a new artery to feed blood to your head,
one would tap off of the heart to feed it, not the tip of a finger.
If you have any further questions please contact me at 340-344-4808.
Thank You,
Michael J. Glidden
EFTA_R1_00555473
EFTA02039913
ℹ️ Document Details
SHA-256
6e65fa93da62d12ea8f48671e9c117d2e054a10f8ad51e0ac4ea36f29264df4e
Bates Number
EFTA02039913
Dataset
DataSet-10
Document Type
document
Pages
1
Comments 0