From: Daphne Wallace
Sent: Friday, August 3, 2012 9:48 PM
To: Jeffre Epstein
Cc:
Subject: Potential sixth bay in the Engineering shed - August 3, 2012
Attachments: Old cistern jpg
Greetings Mr. Epstein,
Danny has a proposal fo= your review:
The old cistern in the Engineering s=ed has been drained. It is approximately 20 feet by 14 feet. If a do=r opening is
created in the outer wall, these could become a sixth storage=bay. Danny estimates it would be a 12 day project: 2 days
to create =he door opening in the outer wall, frame and install the door (the door =s already made), 2 days to wire for
electricity, and 8 days to build and i=stall shelving, epoxy the floor and paint.
This project will have to be separate from the origina= 5 bays project, since that project must be completed by 8/14.
Respectfully submitted,
Daphne and D=nny
1
EFTA_R1_01989273
EFTA02680660
ℹ️ Document Details
SHA-256
6ff56d8d4dfef347387651569bfabca59cc47f8c2ca66c3db9e209466c785fff
Bates Number
EFTA02680660
Dataset
DataSet-11
Document Type
document
Pages
1
Comments 0